My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-10-2025 - Agenda Packet Cc - Regular Meeting
Orono
>
City Council
>
2025
>
11-10-2025 - Agenda Packet Cc - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 4:59:56 PM
Creation date
11/7/2025 4:41:46 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Regular Meeting
Document Date
11/10/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />NEW BRICK& <br />LIMESTONE <br />BANDED MASONRY <br />(L&P) (u;R) (UtA�L) (OCAP) <br />I <br />( I <br />NEW HOSE BIB 1/4 J <br />(U�I — <br />I <br />I <br />J <br />NEW BRICK & <br />LIMESTONE <br />BANDED MASONRY <br />W <br />> <br />O <br />m <br />Q <br />of ---- <br />O <br />O <br />J <br />LL <br />0 <br />Z <br />O <br />W <br />STAINED GLASS TO <br />INTERIOR; TRIPANE <br />IG TO EXTERIOR <br />NEW LONGITUDINAL <br />"RHOUSE" <br />BRICK &LIMESTONE <br />BANDED MASONRY <br />i <br />PRi <br />G <br />� DEMO. EXISTING <br />BRICK & EXTEND <br />WEST TO FACE OF <br />i <br />EXT. DINING AREA <br />i WALL & REPLACE <br />WITH NEW "ROBIE <br />i <br />HOUSE" BRICK <br />i PER TBD DETAIL <br />i <br />1/3 EXISTING SEWER <br />CLEANOUT IN THIS <br />DIRECTION NEAR <br />PROPERTY LINE <br />°o0 w <br />I I � 2x FAUCETS cJi <br />I <br />DW ° ° w DW <br />I I <br />KITCHEN <br />I I <br />MARBLE # 01 <br />SLABS - ---I� <br />/` ) *TBD* IF PRIMARY <br />BEDROOM <br />w WINDOWS ABOVE <br />z ARE OPERABLE PER <br />0 <br />GRILL SMOKE <br />U <br />NEW BRICK & <br />/LIMESTONE <br />BANDED MASONRY <br />I <br />REF <br />w *TBD* IF CENTERED ON INTERIOR <br />z MARVIN DOOR W/ CUSTOM WALL OR ALIGNED WITH PIVOT <br />FREEZER p SDL GRID PATTERN TBD ENTRY DOOR <br />STONE COUNTER <br />"SERVERY" WINDOW BY MARVIN <br />C <br />NEW EXTERIOR GAS FIREPLACE <br />CHIMNEY OF STANDARD BRICK <br />AND LIMESTONE BANDING <br />II <br />w/ CUSTOM GRID PATTERN TBD <br />i <br />w/ PG -RATED OR H2O MGMT SILL <br />i <br />(MARVIN TO SHARE OPTIONS) <br />=- <br />NEW LANDING AND STAIR DOWN TO i <br />i <br />---- _�==L= <br />- - - - - <br />-===-__- <br />=-� =L <br />MECH. ROOM AND IMPACTED HALL, � <br />III <br />DOORS, ORIENTATION AND ALIGNMENT <br />-- - - - - - - - - - <br />- - - - - - - - - - <br />- - - - - ---------- - - - - -- <br />14**TBD <br />BY GENERAL CONTRACTOR** <br />BAR <br />CT)/ <br />TYPICAL: <br />DROP 12" BOX <br />INTERIOR WALL <br />BEAMS W/ TBD <br />PANELING (SPEC. <br />LIGHTING <br />TBD) THROUGHOUT <br />TYP. WOOD WALL PANELING <br />STONE <br />COUNTER <br />DINING WALLS <br />i <br />+-2" CLEARANCE BEHIND <br />FIREPLACE TBD PER <br />MANUFACTURER AND <br />GENERAL CONTRACTOR <br />r TYP. WOOD WALL PANELING <br />m <br />I I � I <br />/ <br />o <br />DINING <br />CEILING: RECESSED STAINED GLASS PATTERN <br />PER FRANK LLOYD WRIGHT MET. MUSEUM <br />z <br />INSPO. SURROUNDING TRIM TBD I DEVELO_P M.E.P. STRATEGY, C> <br />m <br />#02 <br />-4' LOCATIONS AND ORIENTATION aQ�I REF. 36X2 <br />1 TO ACCOMMODATE THIS DOOR QQ <br />BATH A <br />o <br />i I FOR ACCESS TO STEREO, AND OHO <br />IL <br />i TBD HOME AUTOMATION EQUIP.T <br />i <br />- - - - - - - - �Q <br />00 <br />i <br />O <br />� <br />� I <br />�� NOTE: DIMS. ARE UNEQUAL <br />PANTRY ON EACH SIDE OF FIREPLACE. <br />/ a <br />i <br />i <br />FUR NICHE FOR BACK- a <br />LIT STAINED GLASS FUR NICHE FOR BACK- <br />LIT STAINED GLASS <br />I I I I I <br />I I I I <br />DEMO EXISTING FACE BRICK; MAINTAIN TV ABOVE PER <br />**TBD** DEPTHS CLEARANCE REQS.OF <br />EXISTING CONCRETE BLOCK; REUSE OF FIREPLACE MANUFACTURER <br />OF SOFFIT & EXISTING FIREPLACE BOX TBD. NEW OPEN <br />INTERIOR COLUMNS. 1 1 GAS FIREPLACE WITH FAN. IF POSSIBLE WITH <br />TBD ON IF THEY WILL <br />EXISTING BOX, SPEC: VIVIAN FIREPLACE 94w X <br />ALIGN OR NOT. WRAP 50.75h X 9d WITH 48X40 BOX. ***TBD*** <br />COLUMN WITH �— CEILING: BACK -LIT STAINED <br />REEDED WOOD �/ 1 1 GLASS WITH "LATTICE -LIKE" <br />PANELING (SPEC. I I WOOD FEATURE (DETAIL AND <br />TBD) IN -FLOOR OUTLETS (2 OR 3 LOCATIONS II <br />EXTENTS *TBD* <br />I TBD PENDING FURNITURE PLAN) <br />I I I I I <br />I I <br />------ DEN-------- DROP 12" BOX BEAMS ` <br />W/ LIGHTING \ <br />#03 (STRATEGY TBD) t <br />1 I I I I I <br />**TBD** DEPTHS OF SOFFIT & INTERIOR I I <br />COLUMNS. TBD ON IF THEY WILL ALIGN I I <br />OR NOT. WRAP COLUMN WITH REEDED I I <br />WOOD PANELING (SPEC. TBD) <br />I <br />2/3 <br />EXISTING <br />SEWER <br />CLEANOUT I <br />L--------- - - - - - I I - - - - - - - - - - - - - - - - ------ <br />---- - - - - -- -- <br />- - -SECOND FLOOR ABOVE --- <br />First Floor Plan - NOTES <br />1 /4" = 1'-0" <br />MECH. <br />WALL -t---------- <br />O ROOM CHUNG] ICE <br />3/3 <br />TOILET -------- <br />i <br />-r-- <br />MECH. RM. <br />EXTENDS & EXISTING <br />SEWER MURPHY BED HIDDEN IN PANELING <br />r"EQUIP. CLEAN UT 18" DEPTH " <br />EXTENDS ,� � I <br />BENEATH'r ,-------- <br />�A STAIR& >,, OFFICE <br />�p gLANDING //i// ,��A ` T----------------- FRIDGE <br />#04 DRAWERS <br />-- -- - - -- <br />UP 0O I I z <br />� O�q I WALL a <br />OPEN Q' �!o I PANELING -- <br />ii q HIDDEN w <br />TO ABOVE /^\\\ \ 2���ti SAFE/DOOR E ESPERINT. <br />L-- - - - - ---- - - -- <br />- --- <br />o/` \ \ <br />\ I <br />CEILING COFFERING <br />I DETAIL TBD. CENTER O <br />PANEL <br />GLASS ` MULLIONS <br />` <br />RAILING <br />TO MATCH <br />EXTERIOR <br />BALCONY' <br />RAILINGS <br />`W ` SWITCHABLE PRIVACY GLASS <br />CLIC (CLIC GLASS IN MARVIN <br />DIRECT GLAZE UNITS) <br />CLIC) <br />, FLOATING STAIRS TO <br />I LANDING <br />W/ TREAD LIGHTING <br />ON ALL STAIRS <br />---------------7- ------ <br />MAIN- --------J <br />_ — — CUSTOM PIVOT DOOR WITH <br />— ENTRY CUSTOM METAL& WOOD <br />DEMO. EXISTING BRICK & TREATMENTS PER TBD DETAIL <br />REPLACE WITH NEW "ROBIE <br />HOUSE" BRICK PER TBD DETAIL <br />COUNTER/BOOKSHEL <br />BELOW WINDOW TRIM <br />DRAWN AT 12" DEPTH <br />AUTOMATED SHADES FOR OFFICE AND GREAT <br />ROOM SLIDING DOOR (2 ROLLERS: BLACKOUT AND <br />LIGHT -PERVIOUS); POCKET/WALL/CEILING DETAIL <br />TBD. (RECESSED IN CEILING OR WALL FURRED TO <br />HIDE OVER DOOR FRAME; NOT WALL -MOUNTED) <br />EXISTING <br />WELL IN <br />THIS AREA <br />I <br />CURBLESS SHOWER <br />W/ +-3" DROP. <br />FLOOR DETAILS TBD <br />PER G.C. <br />98" TELEVISION WAISHR <br />RECESSED INTO WALL. 28x32 <br />FURRING DEPTH TBD — J <br />DRYER <br />28x32 <br />II <br />T <br />B <br />EXISTING BMC (DIM. <br />1-5/16")ON ALL <br />EXISTING MARVIN <br />DOORS & WINDOWS <br />` NEW BRICK & <br />LIMESTONE <br />BANDED MAS( <br />DEMO. EXISTING BRICK &� <br />REPLACE WITH NEW "ROBIE <br />HOUSE" BRICK PER TBD DETAIL <br />i <br />FLOOR - TO - CEILING <br />\ <br />POCKET DOOR WITH: STAINED GLASS IN Y2 <br />PANEL; SWEEP BENEATH PANEL FOR <br />LAUNDRY SOUND MITIGATION <br />GREAT RM <br />#05 <br />P RUNTED <br />TOILET <br />POCKELETT DOOR <br />VENETIAN PLASTER - POLISHED - <br />THROUGHOUTGREAT ROOM WALLS <br />BATH B <br />------------------- <br />----------------------- <br />o� Y3 <br />------------------- --- <br />COVE MILLWORK ON CEILING (PER TBD DETAIL <br />4 <br />TO ALIGN WITH ENDS OF TELEVISION <br />Z <br />VENETIAN PLASTER - POLISHED - <br />THROUGHOUT GREAT ROOM <br />J� SPECIFICATIONS: <br />° 1. <br />HVAC: Airconditioning, In -floor hydronic heating through out main level, upper level and garage. Two air exchanges <br />�-� <br />with automated CO2 sensors informing CFM boost mode. Note 2x indoor fireplaces (open, gas) with enervex fans. <br />Note specs. for kitchen hood. <br />�P-Ci <br />2. <br />ELECTRICAL/LOW VOLTAGE/AUTOMATION/SECURITY: REFER TO SEPARATE ELECTRICAL DRAWINGS <br />AND SPECIFICATIONS OF CABINETRY FABRICATOR: <br />3. <br />CABINETRY Fabricator to collaborate with PM and GC to determine Scope of Work for Material and Labor <br />responsibilities between CLOSET and MILLWORK contractors. Refer to ORANGE image for current CABINETRY <br />CLOSET responsibilities concerning cabinets, shelves, woodwork. CABINETRY FABRICATOR may be deemed <br />responsible for wall & door paneling that correlate with CABINETS by CABINETRY FABRICATOR <br />4. <br />MILLWORK FABRICATOR to collaborate with PM and/or GC to determine Scope of Work for Material and Labor <br />responsibilities between CABINETRY and CLOSET contractors. Refer to ORANGE image for current CABINETRY <br />& CLOSET responsibilities concerning cabinets, shelves, woodwork. CABINETRY FABRICATOR may be deemed <br />responsible for wall & door paneling that correlate with CABINETS by CABINETRY FABRICATOR <br />5. <br />CLOSET FABRICATOR (NOT CABINETRY) to determine Scope of Work for Material and Labor responsibilities <br />between CABINETRY and MILLWORK contractors. <br />6. <br />PLUMBING: refer to Ferguson Plumbing selections dated 2025.08.15. Verify all items with PM & GC before <br />ordering from Ferguson. <br />7. <br />INTERIOR WALL & CEILING FINISHES: prepare Bid per Drawings and Specifications in this Drawing Set; but <br />schedule meeting with PM (Marco Vincent) to review your specifications prior to sending Bid. <br />8. <br />INTERIOR DOORS: POCKET DOORS: soft close and soft open throughout; FLAT PANEL doors to receive <br />HIDDEN BOOKSHELF and/or WOOD WALL PANELING throughout UPPER LEVEL <br />NEW HOSE BIB 3/4 <br />HOT & COLD <br />R <br />Entry <br />Door <br />MARVIN DOOR W/ CUSTOM <br />GRID PATTERN TBD <br />MUD RM <br />#06 <br />NEW HOSE BIB 2/4 <br />DOG <br />WAS <br />STA ON <br />4/4 <br />GE <br />A <br />WOODWORK <br />kfic rerr oablreE <br />paFrtr' �ablrrets <br />dfgfr?g bar,:abfrnet3 <br />df rrf rrg berms <br />office. bookOtefvferg <br />aC n3om oabfrhffrs <br />�West.. <br />great room oabfrren <br />;eavt <br />pri rr. 1 ca bf roM - <br />bedsfdes <br />pri n'r_ 1 ca bf."em - <br />sout i <br />prim. 1 oabfrem - <br />h fdderl ba [f7r r i <br />d r.S <br />print_ Y oa Nners - ba tr. <br />plfrars?x r` <br />"r.Prfrrr_ lea bf rrets - bat. <br />vanit <br />prim_ 1 baIr M f f rFer <br />cf oser <br />pr fM. 1: Wa fk-4rt dose[ <br />baih A vartlt, <br />ba Cfi 6 va rr f I� <br />bath D varrfq <br />bam. F vanfC, <br />ra r�dfrrg t oaxoa 5e <br />fa r.,di rrg bookcase - <br />h fdder7 door <br />is ndi qg t oOJr: Se- bar <br />.�Cudy bo�k�as.e ti <br />of ff repface.l <br />.study bar <br />all caber;.abinets ai'Iw <br />clots by afj':SEf <br />FABR ICATOR } <br />4 <br />NOT FOR <br />CONSTRUCTION <br />3 Project #: <br />Date: <br />Checked by: <br />Progress Set #: <br />Erickson at Partenwood <br />2025.10.07 <br />#30 <br />1 Revision 1 Date 1 <br />LO <br />00 <br />00 <br />106 <br />E Cl) <br />M <br />0) <br />LO <br />U — <br />N � <br />•O � <br />d <br />N <br />(n <br />0) >1 <br />c CU <br />•3 0 <br />(6 <br />CL61 <br />� Y <br />a H <br />O a) <br />� U <br />N <br />O <br />L <br />m Cz <br />2 E .2 <br />P <br />a <br />GAS <br />O <br />O <br />3: <br />U) <br />LLJ <br />O <br />a) <br />Z <br />1 <br />� <br />� <br />CIO <br />U <br />n <br />N <br />U <br />L <br />°' <br />d <br />L <br />2 <br />Q <br />O <br />a <br />_O <br />LL <br />04 <br />04co <br />N <br />•M <br />00 <br />L <br />Y <br />L <br />� <br />a <br />W <br />ci <br />A01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.