Laserfiche WebLink
33' - 5" <br />5- 10 1/4" 21' - 8 1/2" 5'- 10 1/4" 63- 0 15/16" <br />ROOFING 3/12 AND 4/12 SLOPES: <br />CEDAR SAWED BLUE LABEL SHINGLES <br />0'-4" <br />1'-0" APPLIED PER CEDAR SHAKE & SHINGLE BUREAU (LOW SLOPE) <br />ROOF DECK: 5/8" CDX PER APA <br />1'-81/4" GRACE ICE & WATER SHIELD THROUGHOUT W/ ADDITIONAL <br />OVERHANG 1' 81/4" HEAT RESISTANT PRODUCT BENEATH ANY SOLDERED METAL ` SHERIDAN METAL SOLDERING <br />1'-81/4" 4"/12" AREAS AT SLOPES 2/12 OR FLATTER <br />4'-6" AND AT CONDITIONS BUBBLED <br />4'-6" CEDAR SHAKE BREATHER 3D MATRIX FOR AIR GAP. INSTALLED ON DRAWING. FOR BID, CONSULT <br />OVERHANG PER MFCTR. GC FOR ESTIMATING SF OF SOLDERED <br />OVERHANG <br />SURFACES <br />STAINLESS STEEL FASTENERS <br />3"/12" <br />OVERHANG <br />2'-3" <br />6'- 113/8" 14' - 2 7/16" 3- 6 3/16' 4' - 8 11/16" 1' - 3 1/16" 14' - 2 7/16" <br />N <br />12" 3"/ 12" 3"/ 12" <br />rn 41/1 2" OPENINGS <br />DO IN EAVE <br />AND SOFFIT <br />0 3"/ 12" <br />8'- 7 1/4" 8' - 7 1/4" <br />00 ih <br />z a � m OVERHANG-1 F1 F1 F1 F1 F1 <br />O Z Q -1 ElNF1 <br />N o � io OVERHANG <br />F <br />-6 VV <br />m OVERHANG CHIMNEY m OVERHANG <br />OVERHANG <br />OVERHANG 1.25" <br />0 / 12" 411/12" 1.25" <br />*FINAL / 12" <br />SLOPE *FINAL <br />TBD* SLOPE <br />00 <br />0 TBD* <br />O <br />c- <br />in <br />m <br />4"/ 1 2" <br />CN <br />EXISTING <br />CHIMNEY v <br />o <br />m <br />OPENINGS <br />EAVE N <br />3"/12" <br />4"/ 1 2" <br />3"/ 1 2" <br />3"/ 12" <br />cn <br />m <br />50 cV <br />4' - 6" OVERHANG <br />OVERHANG <br />4"/ 1 2" <br />OVERHANG <br />a <br />)T Flan <br />H5 3/1 " m 7' - 5 3/16" 22' - 3" <br />37' - 1 7/16" <br />3"/12" <br />00 <br />4"/12" <br />7' - 5 1/4" <br />4"/ 1 2" <br />OPENINGS <br />IN SAVE o <br />AND SOFFIT o <br />OVERHANG <br />I- <br />18'-27/8" <br />OVERHANG <br />LJEJuuu EUUEE <br />37' - 115/8" <br />8'- 5 13/16" <br />ALL EXISTING ROOFING AND ROOF <br />STRUCTURE TO BE REMOVED AND REPLACED <br />EXCEPT GARAGE ROOF <br />9 <br />7r,> <br />18' - 2 13/16" <br />411/12" 411/12" <br />3 -6 <br />— EXISTING METAL <br />ROOFING TO BE <br />REMOVED AND <br />REPLACED —7 <br />A <br />SOFFIT: <br />FLAT SOFFIT FOR ALL 4:12 SLOPES (MAIN ROOF <br />AND GARAGE ROOF) <br />NO FLAT SOFFIT FOR OTHER ROOF OVERHANGS <br />(CUPOLAS AND DORMERS) <br />4"/ 1 2" <br />OVERHANG <br />4"/ 1 2" <br />m <br />0 <br />N <br />"/12" <br />titi� i$ <br />29 <br />a3i8. <br />z <br />0 <br />z <br />0 <br />0 <br />LL <br />I- <br />0 <br />z <br />4 <br />NOT FOR <br />CONSTRUCTION <br />3 Project #: Progress Set 29 <br />Date: 5/16/2025 <br />Integrated Design, Drawings, Project Mgmt by: <br />Marco Vincent I Takka Day Design 1651.336.8885 <br />Noz <br />1 Revision 1 Date 1 <br />105 <br />LJ <br />2 <br />AJ <br />�0 <br />O <br />O <br />LO <br />L <br />L <br />Q_ <br />V <br />N l <br />ON <br />W <br />L NO <br />a L0 <br />