Laserfiche WebLink
APPENDIX A (CONT'D <br />RESTORATION <br />5,000 <br />Cu.yda. <br />Common excavation @ $5.00/c.y. <br />$25,000.00 <br />5,500 <br />Ton <br />Class <br />5 (100% crushed) @ $7.00/ton <br />38,500.00 <br />2,200 <br />Ton <br />2341 <br />bituminous mix @ $20.00/ton <br />44,000.00 <br />132 <br />Ton <br />AC-1 <br />bituminous material for mix @ $200.00/ton <br />26,400.00 <br />10 <br />Acres <br />Seed <br />with topsoil @ $4,000.00/acre <br />40,000.00 <br />175 <br />Each <br />Clear <br />and grub tree @ $140.00/ea. <br />24,500.00 <br />Total <br />$198,400.00 <br />+ 5% Contingency <br />9,920.00 <br />$208,320.00 <br />+ 25% Legal, Eng., 6 Admin. <br />52,080.00 <br />Total Construction Cost <br />$260,400.00 <br />-S- <br />0-483 7c <br />