Laserfiche WebLink
APPENDIX A <br />DETAILED COST ESTIMATE <br />SANITARY SEWER <br />825 <br />Lin.ft. <br />8" PVC, <br />0'-8' deep @ $15.00/l.f. <br />$12,375.00 <br />1,230 <br />Lin.ft. <br />8" PVC, <br />8'-10' deep @ $11.00/l.f. <br />20,910.00 <br />2,870 <br />Lin.ft. <br />8" PVC, <br />10'-12' deep @ $20.00/l.f. <br />57,400.00 <br />850 <br />Lin.ft. <br />8" PVC, <br />12'-14' deep @ $22.00/l.f. <br />18,700.00 <br />425 <br />Lin.ft. <br />8" PVC, <br />14'-16' deep @ $25.00/l.f. <br />10,625.00 <br />270 <br />Lin.ft. <br />8" PVC, <br />16'-18' deep @ $27.00/l.f. <br />7,290.00 <br />970 <br />Lin.ft. <br />8" PVC, <br />18'-20' deep @ $30.00/l.f. <br />.9,100.00 <br />635 <br />Lin.ft. <br />8" PVC, <br />20'-22' deep @ $40.00,'l.f. <br />25,400.00 <br />250 <br />Lin.ft. <br />8" PVC, <br />22'-24' deep @ $45.f0/1.f. <br />11,250.00 <br />50 <br />Lin.ft. <br />8" PVC, <br />24'-26' deep @ $5C.00/l.f. <br />2,500.00 <br />35 <br />Each <br />Manhole <br />@ $1,200.00/ea. <br />42,000.00 <br />55 <br />Lin.ft. <br />8" DIP, <br />outside drop @ $100.00/l.f. <br />5,500.00 <br />214 <br />Lin.ft. <br />Manhole <br />overdepth 2 $100.00/l.f. <br />21,400.00 <br />83 <br />Each <br />Service <br />wye branch @ $50.00/ea. <br />4,150.00 <br />2,200 <br />Lin.ft. <br />4" CISP <br />service pipe a $16.00/1.f. <br />35,200.00 <br />200 <br />Lin.ft. <br />4" CISP <br />riser pipe @ $30.00/l.f. <br />6,000.00 <br />180 <br />Lin.ft. <br />Jacking <br />4" CISP and casing @ $50.00/l.f. <br />9,000.00 <br />200 <br />Lin.ft. <br />Jacking <br />of 8" DIP 6 casing @ $200.00/l.f. <br />40,000.00 <br />50 <br />Lin.ft. <br />4" DIP force <br />main @ $15.00il.f. <br />750.00 <br />LUMP <br />SUM <br />Cut into <br />existing force main 9 $6,000.00/L.S. <br />6,000.00 <br />LUMP <br />SUM <br />Lift station <br />@ $60,000.00/L.S. <br />60,000.00 <br />3,000 <br />Ton <br />Rock stabilization <br />@ $10.00/ton <br />30,000.00 <br />Total <br />$455,550.00 <br />5% <br />Contingency <br />22,775.00 <br />$478,325.00 <br />+ 25% Legal, Eng., b Admin. <br />119,575.00 <br />Total <br />Construction Cost <br />$597,900.00 <br />- 4 - <br />0-4857c <br />