Laserfiche WebLink
84-1 Sanitary Sewer Extension <br />84-2 Street 6 Boulevard Restoration <br />Total Estimated Project Cost <br />$597,900.00 <br />260,400.00 <br />$858,300.00 <br />ASSESSMENTS: The project costa as outlined are proposed to be assessed to the <br />adjacent property based on benefit received. There are 83 units to be served <br />as a part of the improvement with the potential to serve an additional 2 units <br />in the future. The City property in the area is proposed to be assessed 5 <br />units. <br />Total Estimated Pr t Cost <br />Estimated Unit Cost <br />$858,300.00 <br />$ 10,341.00 <br />The property to be assessed is shown on Figure II at the back of this <br />report. <br />CONCLUSIONS b RECOMMENDATIONS: The proposed improvements described in this <br />report are feasible as they relate to general engineering principals and <br />construction procedures. The following recommendations, based on data in this <br />supplemental report are presented for the City Council's consideration. <br />1. The City or Orono adopt this report as a guide for the installation of <br />sanitary sewer in the Crystal Bay area. <br />2. The easement acquisition be reveiwed with the property owners prior to <br />proceeding with the project. <br />3. The following Project Schedule be implemented for this project: <br />2 <br />0-4857c <br />