My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-10-1984 Council Packet
Orono
>
City Council
>
1984
>
12-10-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 2:40:19 PM
Creation date
11/3/2025 2:27:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FEASIBILITY REPORT SUPPLEMENT <br />CRYSTAL BAY SANITARY SEWER IMPROVEMENTS <br />DISCUSSION: This Supplement to the feasibility report for the Crystal Bay <br />sanitary sewer improvements has been prepared to outline a more economical <br />plan for constructing the project. The Report supplement provides for the <br />placement of sanitary sewer lines on easements in several areas to shorten the <br />length of line constructed and minimize the street reconstruction costs. <br />The layout of the sanitary sewer lines proposed in this report are shown <br />on the attached plan. Placement of the sanitary sewer lines on easements will <br />require the close cooperation of the residents or the project costs could <br />exceed that outlined in the original feasibility report. Easements will also <br />to required for the placement of services to the individual homes. <br />This supplement also provides for a reduction in the street section. The <br />original report provided for a 28 foot wide street with berm curbs in <br />accordance with the City zoning code. This report supplement provides for the <br />replacement of only those streets disturbed by construction. The disturbed <br />streets would he reconstructed to a 16 foot width whir, is similar to the <br />existing section. The report also eliminates the sod from the project with <br />all areas disturbed being seeded. <br />COST ZSTIMATE: The summary of project costs are outlined below with the <br />detailed cost estimates provided at the back of this report. The cost <br />estimates are based on unit prices for the 1985 construction season. <br />The coat estimates presented below include a 5 percent allowance for <br />contingencies and a 25 percent allowance for project design, administrative, <br />bonding, capitalised interest, and legal costs. <br />- 1 - <br />0-485 7c <br />
The URL can be used to link to this page
Your browser does not support the video tag.