My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-29-1984 Council Packet
Orono
>
City Council
>
1984
>
10-29-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2025 10:10:52 AM
Creation date
10/30/2025 10:01:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />The peak now for Maple Plain is more than six times the average daily flow. <br />Orono contends that the peak design flow should only be 3.5 times the average <br />daily flow, whic:i is normal engineering practice. <br />The city of M?.ple Plain has infiltration/inflow (1/1) problems in their local <br />collection system. Several years ago Maple Plain conducted an I/I analysis <br />that concluded excessive I/1 existed and it would be cost-effective to elimi- <br />nate a portion of this I/I. However, the city has not proceeded with the more <br />detailed sewer system evaluation survey which pinpoints the problem areas and <br />assesses the likelihood of removing the I/I. <br />Based on the fact that excessive flow up to a peak of 2.2 mgd currently exists <br />the, MWCC designed this facility to accommodate the exi.ti;ig peak flows. If <br />Maple Plain can reduce this peak flow from six to 3.5 times the average daily <br />flow the MWCC would still recommend utilizing a 12-inch diameter pipe. A 10- <br />inch diameter pipe would have a total dynamic head of slightly over 200 feet. <br />While this size may be marginally acceptable, better engineering practice would <br />dictate going to the next size pipe for an additional safety factor. Further- <br />more, it is uncertain that Maple Plan can reduce their peak flows to allow for <br />the smaller pipe. <br />Orono"s chief concern with the construction of a 12-inch force main is the <br />development pressures the city will receive for development in their rural <br />service area which the force main will go through. Since a 12-inch force main <br />is needed for Maple Plain alone, whether they remove I/I or nct, no additional <br />capacity is designed into this force main for rural Orono. This being the case <br />Orono should be able to control development in accordance with their approved <br />Comprehensive Plan. <br />The Long Lake pump station which the Maple Plain force main discharges into may <br />require an additional pump to accommodate the peak flows from Maple Plain. How- <br />ever, provisions were made in the Long Lake pump station to add an additional <br />pump. The Long Lake 16-inch force main is adequate to supply the needs to the <br />areas presently severed and presently committed to be sewered. However, as <br />long as the high peak flows from Maple Plain remain, little additional capacity <br />is available in the Long Lake force main to serve additional rural areas of <br />Orono west of Long Lake. <br />At present, the NPDES permit for the Maple Plain plant and the construction per- <br />mit for the force main limit service connections to local service areas only. <br />No rural area is to be provided sewer service. The current Council policy also <br />prohibits rural area development from receiving metropolitan sewer service. <br />These conditions are adequate for the current sewer service areas. <br />FINDINGS OF FACTS AND CONCLUSIONS <br />The MWCC has submitted plans and specifications for Council comments on the <br />Maple Plain pump station and force main to phase out the Maple Plain STP. The <br />plans provide for a 12-inch force main capable of pumping 1,700 gallons of <br />wastewater per minute. This capacity is needed, according to MWCC records <br />because of the excessive I/I from the Maple Plain sewerage systems. <br />RECOMMENDATION <br />That the Metropolitan Council find the Maple Plain pump station and 12-inch <br />force main consistent with the Council Policy Plan and the MWCC 1984-1988 <br />Development Program. <br />JL1669-PHENV2 <br />09.18.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.