Laserfiche WebLink
CITYof ORONO <br />Post Office Box 66•C'rystal Bay, Minnesota W23•Municipp! CTres <br />On the North Shore of Lake Minnetonka <br />August 31, 1984 <br />Mr. Lowell Thompson <br />Director Environmental Planning <br />Metropolitan Council <br />302 Metro Square Building <br />St. Paul, Minnesota 55101 <br />Dear Mr. Thompson: <br />Regarding our telephone conversation concerning the proposed Maple <br />Plain interceptor, I wish to submit the following comments. <br />The concerns of the City of Orono are the changes from the preliminary <br />design to the final design increasing the force main size from 10" to <br />12" and the increase in flows as follows: <br />Preliminary Final <br />Design _ Design <br />design average daily flow 0.385 M.G.D. 0.403 M.G.D. <br />peak design flow 1.35 M.G.D. 2.43 M.G.D. <br />peak flow factor 3.5 6.0 <br />After considerable review this spring, the City of Orono reluctantly <br />withdrew from the public hearing process challanging the proposed <br />construction o` the Maple Plain interceptor through rural Orono, based <br />upon a 10" force main and the preliminary design flows, which could rot <br />provide urban services in our rural area according to the City of Orono <br />Community Management Plan. <br />I understand that the Metropolitan Systems Committee will be meeting <br />on September 10th and that this iten, will be on that agenda. <br />I would appreciate the Systems Committee review of this matter if it is <br />convenient to do so on the 10th. <br />BUILDING d ZONING - 473-7357 • ADMINISTRATION A FINANCE - 47) 7358 s PUBLIC WORKS 473-' 359 <br />ASSESSING- <br />