My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-01-1984 Council Packet Special Meeting
Orono
>
City Council
>
1984
>
10-01-1984 Council Packet Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 10:44:48 AM
Creation date
10/27/2025 10:38:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />John Gerhardson, City of Orono <br />If..it is your opinion that the entire 83 properties are <br />to be appraised, the 83 reports will include all the <br />information previously discussed for incl,,ision in the 20% <br />sampling. <br />Since there will be some duplication, of data for all the <br />reports, there will be something less than 4 times the <br />work required for the 20% sampling. Therefore, the fee for <br />the 83 parcels will run to $8000. Again, if the time frame <br />for completion of the entire project is less than I have <br />envisioned, the fea will be adjusted accordingly. <br />In order for the smooth flow of work, I ask that your City <br />offices provide me with the following information; <br />1. Assessed valuation market value and PID number <br />for the properties to be appraised when they <br />are selected. Property owner 5 address. <br />2. Analysis by City of Orono people as to the <br />failing or failed septic systems. <br />3. Synopsis of City zoning regulations including <br />conditions under which SF or lot size may be <br />altered from the present size. <br />4. The most recent information the City Engineer's <br />office may have relative to groundwater depth <br />and recent changes in that depth. <br />The schedule for completion of the 20% samplinq can be no <br />later than November 13, 1984. Completion of the 83 homes <br />to be appraised can be no later than December 15, 1984. <br />I trust I have covered everything we discussed on 27 Sept <br />ember. I look forward to hearing from you when I return to <br />my office on 8 October. <br />Sincerely, <br />ohn C Farrell, CRA <br />praiser <br />ccs Thomas Radio, City Attorney <br />
The URL can be used to link to this page
Your browser does not support the video tag.