My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-13-2025 Agenda Packet Cc - Regular Meeting
Orono
>
City Council
>
2025
>
10-13-2025 Agenda Packet Cc - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 7:46:39 AM
Creation date
10/23/2025 9:01:20 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Regular Meeting
Document Date
10/13/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: October 13, 2025 <br />Title: Kenobi Pond Rehabilitation Award <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: Consent Agenda <br />Purpose: <br />The purpose of the item is to accept a quote for the restoration of Kenobi Pond. <br />Item: 13 <br />2. Background: <br />Kenobi pond is large storm pond located south of the industrial district and north of Highway 12. <br />It receives run off from the northern part of the city around the Stone Bay development area. Last <br />year's inspections identified a breach in one of the embankments, and while repairs were made it <br />was noted that, due to the current lay out of the pond and ditch system, there are several other <br />embankment penetrations that will cause future issues. <br />3. Scope: <br />This project would reconfigure the northern inlet into the pond, adjust the embankment and <br />provide erosion control to the southern inlet to the pond. <br />4. Cost: <br />The city solicited and received quotes from four contractors. The low quote is from Sunram <br />Construction for $72,970. <br />Project Costs: <br />Activity <br />Vendor <br />Cost <br />Comments <br />Design and <br />Bolton & <br />$11,000 <br />Previously Approved - <br />Engineering <br />Menk <br />Not To exceed <br />Construction <br />Sunram <br />$72,970 <br />Construction <br />Total <br />1 <br />1 $83,970 <br />Funding: <br />The project is funded by the Stormwater Fund. The CIP allocated $100,000 for this project. The <br />projected end of year balance for the fund is $645,000. <br />6. Staff Recommendation: <br />Accept Quote for Sunram. <br />COUNCIL ACTION REQUESTED <br />Move to accept quote from Sunram for the Kenobi Pond Project for $72,970. <br />Exhibits <br />A. Kenobi Pond Quote Summary <br />B. Kenobi Pond Plan Set <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.