My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-1984 Council Packet
Orono
>
City Council
>
1984
>
09-10-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 12:49:26 PM
Creation date
10/20/2025 12:39:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ranuary 10, 1984 <br />Mayor and City Council <br />City of Orono <br />Box. 66 <br />Crystal Bay, Mn. 55323 <br />Cea r t'ayor and C i , Counc i I: <br />This is to answer a letter we recieved from Bruce Malkerson'today. <br />Tom Rutten, Paul Smith's attorney, called two days before Christmas and <br />acein betr:een Christmas and New Years. He spoke both times to Mrs. Powers. <br />Fe said he would call back around Jan. 3• We have not heard from him to date. <br />We have been waiting since Sept. to hee- something from Smith or his attorney. <br />Finally %..e gave up and Plans A,B,C were put array. We found that the value <br />placed on our lot by the company doing the plans was about $26,000 less <br />than that of it's taxed value. <br />We agreed to a plan over one year ago, and do not need nor want to wait <br />30 days longer, we have been waitirig for 2 years for Smith to get his act <br />together. <br />Nor, Widmer looked at both lots the first of Sept. We would be glad to <br />have his company do the work and would leave the decision to him as to <br />v:hich Plan he thinks would be the best and with the least damage to the <br />crourds. If Smith changes contractors, again, we request to be informed. <br />Smith nor his attorney has presented any kind of an agreement to us. <br />We told Tom Rutten that we would require all plans for repair of she <br />land in r:riting. <br />We refuse to take blame fer delaying this project, it has costed u- much <br />wasted time and many dollars. The selling of either house has been im- <br />possible for the last two years because of this delay. Mrs. Powers told <br />the Council almost 2 years ago that we wanted the project completed "like <br />Yesterday". <br />The Smiths were here for about 4 weeks last summer but made no attempt <br />to settle the problem. <br />Please do what you can to bring an end to this invasion of our privacy <br />and the waste of all of our time. <br />Very truly yours, <br />•1 <br />1.. <br />cc <br />Bruce Malkerson <br />Tcm Put ten ,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.