My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ON <br />vision of the Contract Documents, any Work is found to be defective, Con- <br />tractor shall promptly, without cost to Owner and in accordance with Owner's <br />written instructions, either correct such defective Work, or, if it has been <br />rejected by Owner, remove it from the site and replace it with nondefective <br />Work. If Contractor doe9 not promptly comply with the terms of such <br />instructions, or in an emergency where delay would cause serioss risk of loss <br />or damage, Owner may have the defective Work corrected or the rejected Work <br />removed and replaced, and all direct and indirect costs of such removal and <br />replacement, including compensation for additional professional services, <br />shall be paid by Contractor. <br />7.14 ACCEPTANCE OF DEFECTIVE WORK <br />If, instead of requiring correction or removal and replacement of defective <br />Work, Owner (and, prior to Engineer's recommendation of final payment, also <br />Engineer) prefers to accept it, Owner may do so. In such case, if acceptance <br />occurs prior to Engineer's recommendation of final payment, a Change Order <br />shall be issued incorporating the necessary revisions in the Contract <br />Documents, including appropriate reduction in the Contract Price; or, if the <br />acceptance occurs after such recommendation, an appropriate amount shall be <br />paid by Contractor to Owner. <br />7.15 OWNER MAY CORRECT DEFECTIVE WCRK <br />If Contractor fails within a reasonable time after written notice of Engineer <br />to proceed to correct and correct defective Work or to remove and replace <br />rejected Work as required by Engineer in accordance with Paragraph 7.12, or if <br />Contractor fails to perform the Work in accordance with the Contract Documents <br />(including any requirements of the progress schedule), Owner may, after seven <br />days' written notice to Contractor, correct and remedy any such deficiency. <br />In exercising his rights under this paragraph, Owner shall proceed <br />expeditiously. To ,.he extent necessary to complete corrective and remedial <br />action. Owner may exclude Contractor from all or part of the site, take <br />possession of all or part of the Work, and suspend Contractor's services <br />related thereto, take possession of Contractor's tools, appliances, <br />construction equipment and machinery at the site and incorporate in the Work <br />all materials and equipment stored at the site or for which Owner has paid <br />Contractor but which are stored elsewhere. Contractor shall allow Owner, <br />Owner's representatives, agents and employees such access to the site as MAY <br />be necessary to enable Owner to exercise his rights under this paragraph. All <br />,!irect and indirect costs of Owner in exercising such rights shall be charged <br />against Contractor in an amount verified by Engineer, and a Change Order shall <br />be issued incorporating the necessary revisions in the Contract Documents and <br />a reduction in the Contract Price. Such direct and indirect costs shall <br />include, in particular but without limitation, compensation for additional <br />professional services required and all costs of repair and replacement of work <br />of others destroyed or damaged by correction, removal or replacement of <br />Contractor's defective Work. Contractor shall not be allowed an extension of <br />the Contract Time because of any delay in performance of the Work attributable <br />to the exercise by Owner of Owner's rights hereunder. <br />23 - <br />3526a <br />4l81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.