My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-1984 Council Packet
Orono
>
City Council
>
1984
>
03-12-1984 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 9:33:58 AM
Creation date
10/20/2025 9:29:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ewj <br />Bring slab surfaces to the correct level with a straight edge and then strike <br />-- off. Use bullflosts or derbies to smooth the surface, leaving it free from <br />bumps and hollows. <br />Do not sprinkle water on the plastic surface. Do not aisturb the slab sur- <br />faces prior to start of finishing operations. <br />03300.6.2. Cold Weather Placing: Do not place concrete when the air tempera- <br />ture is less than 40 degrees F. without the specific approval of the Engi- <br />neer. Comply with ACI 306 to protect all concrete work from physical damage <br />and reduced strength which would be caused by frost, freezing actions, or low <br />temperatures. <br />03300.6.3. Hot Weather Placing: When hot weather conditions exist, comply <br />with ACI 305. Wet forms and reinforcement thoroughly prior to placement of <br />concrete. Maintain concrete temperature at time of placement below 90' F. <br />03300.7. CONCRETE FINISHING: Provide finishing operations as specified <br />herein and as shown on the plans. <br />03300.7.1. Float Finish: Apply float finish to all slab surfaces that are to <br />receive trowel finish and other finishes. <br />After placing concrete slabs, do not work the surface until ready for float- <br />ing. Begin floating when the surface water has disappeared and when the con- <br />crete has stiffened sufficiently to permit operation of a power -driven float. <br />Consolidate the surface with power -driven float, or by hand -floating if the <br />area is small or inaccessible to power units. <br />Check and level the surface plane to a tolerance not exceeding 1/8 inch in 10 <br />feet when tested with a 10 foot straightedge placed on the surface at not less <br />than two different angles. Uniformly slope to drains at 1/16" per ft. <br />Immediately after leveling, refle-t the surfaces to a smooth, uniform, <br />granular texture. <br />03300.7.2. Trowel Finish: After floating, begin the first trowel. finish <br />open— ion using a power -driven trowel oc equal. Begin final troweling when <br />the burface produces a ringing sound as the trowel is moved over the surface. <br />Consolidate the concrete surface by the final hand -troweling operation, free <br />from trowel marks, uniform in texture and appearance, and with a surface plane <br />tolerar^_e not exceeding 1/8 inch in 10 feet when tested with a 10 foot <br />t.• straightedge. <br />03300.7.3. Non Slip Broom Finish: Apply nonslip light hair broom finish to <br />all concrete slabs. <br />Immediately after trowel finishing, slightly roughen the concrete surface by <br />brooming in the direction perpendicular to the main traffic route. <br />60 <br />j <br />03300-3 <br />0-9593b <br />I �10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.