My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4860
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4800 - 4899 (May 13, 2002 - November 25, 2002)
>
Resolution 4860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 2:01:07 PM
Creation date
11/13/2015 2:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 . <br /> . . J <br /> I O� <br /> � O � O <br /> - s CITY of ORONO <br /> � � <br /> . � � �:. � <br /> RESOLUTION OF THE CITY COUNCIL <br /> ti � <br /> �L`9 p4'�G NO. <br /> kESI3 <br /> the style of lighting found at the Orono Administrative Facilities. <br /> Site lighting along the west and south boundaries shall be <br /> provided adequate to light the trails alonj these two sides of the <br /> property. <br /> 13) Final decisions by the Developer regarding colors, types and <br /> qualities of building materials shall be subject to Council approval. <br /> The proposed building shall be subject to the Architectural <br /> Standards for the B-6 District per Zoning Code Section 10.45, <br /> Subd. 6(n. The proposed dumpster enclosure shall be compatible <br /> architecturally with fhe proposed medical building and may be <br /> located near the southeast corner of the Properiy to allow for joint <br /> use with the Adjacent Parcel. <br /> 14) � The use of the building is specifically approved for professional � <br /> . office use. Retail uses accessory to�the office use may be allowed <br /> through a formal amendment of the PUD, but if approved the <br /> combination of all such uses shall�not exceed 5% of the gross <br /> floor area of the building. <br /> 15) Applicants' architect shall submit final development plans to the <br /> Metro Council Environmental Services to determine the exact ' <br /> number of SAC units to be charged at the time of the issuance of • <br /> building permits. <br /> 16) Developer shall provide suitable evidence of Minnehaha Creek <br /> Watershed District . (MCWD) approval of the stormwater <br /> � management plan before Development Plan. Approval will be <br /> granted. Erosion control shall adhere to "Best Management <br /> Practices for Protecting Water Quality in Urban Areas". � All <br /> erosion controls as required by the City and by the MCWD shall <br /> be in place prior to commencement of excavation on the site. <br /> � 17) This Revised Concept Plan approval is based upon the known � <br /> . issues that may affect this project, but this approval does not limit <br /> the City from revising or amending these conditions as the review <br /> process continues. � <br /> � <br /> Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.