My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4860
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 4800 - 4899 (May 13, 2002 - November 25, 2002)
>
Resolution 4860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 2:01:07 PM
Creation date
11/13/2015 2:01:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 , <br /> • � ! <br /> � O� <br /> � O ,'�. � O <br /> 3 CITY of ORONO <br /> � -�.;.. � <br /> , ti <br /> �� G�' RESOLUTION OF THE CITY COUNCIL <br /> �`9kEsI3.Og'� No. � � � � � <br /> 9) Street lighting along Kelley Parkway adjacent to the Property shall <br /> be provided by the Developer and shall be of a style, number, <br /> height and location approved by the City Council. <br /> 10) Along Old Crystal Bay Road, the setback from the eastern edge <br /> of the existing trail to the back of parking lot curb shall be no less <br /> than 5 feet. A suitable buffer to provide a sense of physical <br /> separation between the parking lot and users of the trail shall be <br /> provided, in the form of a hedge or vegetative barrier, a berm, a <br /> short barrier wall, additional separation, or some other method <br /> acceptable to the City Council. A traii easement shall be granted <br /> to the City over the westerly 25' of the Property. The City shall <br /> be responsible for maintenance of this trail. <br /> 11) The proposed pedestrian trail �along Highway 12 shall be <br /> • constructed by the developer and shall be 8' wide, of bituminous <br /> surfacing and shall be located either within the Highway 12 right- <br /> of�vay, subject to MnDOT approval, or within the Property, <br /> approximately abutting the south Property line. The intent of this <br /> trail is to provide a connection to the existing and future trail <br /> system along Highway 12, while providing separation from the <br /> traveled portion of the right-of-way. Because it is unknown at this <br /> time whether the Highway 12 shoulder may be converted from a <br /> rural section to an urban section, the exact location and design of <br /> the trail cannot be determined at this time. Therefore, construction <br /> of this trail may be deferred until such time that development of <br /> . the Adjacent Parcel occurs, and/or until such time that a decision <br /> � on the design of the�Highway 12 shoulder is reached. The City <br /> Council shall make the final determination of when and how the <br /> trail is to be constructed. Developer shall post suitable financial <br /> security in the interim for such construction. The City shall be <br /> responsible for the maintenance of this trail upon its completion <br /> and acceptance. � <br /> 12) Signage and lighting on the site shall adhere to the pertinent <br /> zonin� code standards, and shall be subject to approval by the <br /> �' City Council. Site lighting shall be lo�v and shielded, similar to <br /> Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.