My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2002 Board of Appeal and Equalization Reconvened Packet
Orono
>
City Council
>
2002
>
05-13-2002 Board of Appeal and Equalization Reconvened Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 2:14:06 PM
Creation date
10/9/2025 2:11:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
//• <br />’’4 <br />- a <br />f. Jb^. . - <br />'J . <br />vt <br />ii............ <br />r ^ • <br />iitu':.’ <br />SUBJECI ir^FORMATION SHEET <br />NAME Shirley Hendrickson & Rick Windenburg <br />ADDRESS 3200 Nonh Shore Drive__________ <br />PID# 08-lt7»23-4l-000l PROPERTY TYPE _RE <br />SALE PRICE $324,500 SALE DA 11: Feb. 2000 YEAR BUILT 1910 <br />STORY HOT. 1.75 <br />GROSS BLDG. AREA 1.630 <br />GROUND FLR. AREA 1.026 <br />GARAGE - ATT. 680 sf. <br />DET. _ _ _ <br />TUCKUNDER <br />CENTRAL AIR Yes <br />BSMT. FINISHING _0 <br />BATH- DELUXE __ <br />FULL J_ <br />3/4 J_ <br />1/2 <br /># OF BEDROOMS <br />WALKOUT No <br />LOT SIZE 32.884 (.76ac) <br />PORCH - GLAZED <br />SCREENED <br />OPEN 24 sF. <br />DECK 402 sf. <br />2 # OF FIREPLACES I <br />LAKESHORE 60 IT <br />MISC. COMMENTS: There is only a partial basement and small portions are dirt floor. The ceiling <br />in the stairwell from the basement to the main floor is painted ceiling tile. That was the only portion <br />found to have ceiling tile. The exposed pipe is in the kitchen area, next to the dishwasher. Several <br />window's have been replaced and the bath on the same level as the sunroom has recently been <br />remodeled with marble tile and a pedestal sink. <br />VALUATION 2001 PAY 2002 2002 PAY 2003 RECOMMEND COUNCIL ACTION <br />LAND $208,000 $230,000 $230,000 <br />BUILDING $ 99.000 $131,400 $128,000 <br />TOTAL $307,000 $361,400 $358,000 <br />ASSESSOR:Kim Jensen DATE: 5-9-02 <br />-ft
The URL can be used to link to this page
Your browser does not support the video tag.