My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-29-2004 Council Work Session
Orono
>
City Council
>
2004
>
01-29-2004 Council Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 1:44:52 PM
Creation date
10/9/2025 1:44:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Goals for 2003 <br />The following is a list of proposed goals for 2003. <br />1.Navarre Fire Station <br />Design and consUucl a fully functional, complete, cost-effective, attractive <br />neighbortiood fire station that is compatible with the area, and that is completed by <br />E)ecember 31,2003. <br />a. Ensure the construction of the fire station occurs in the most cost-effective <br />manner, change orders are minimized, and cost overruns prevented. <br />2. Navarre Fire Service <br />Facilitate the efforts of the Long Lake Fire Department and the Excelsior Fire District <br />to develop and implement a plan to ensure the continuation of high quality fire <br />service to the Navarre area in 2004. <br />3. Highway 12. <br />a.. Maintain proactive involvement and communication with Mn/DOT to: <br />1). Ensure the funding for the Highway 12 project remains fully in place, and <br />prevent further delays to the project timeline. <br />2). Ensure the final design adequately addresses the goals, issues, and concerns <br />identified in the City ’s preliminary design approval. <br />3). Ensure the construction phase impacts are minimized. <br />4). Ensure proper mitigation is provided for the noise to be generated by the traffic <br />on the corridor. <br />5). Ensure the City receives the optimum value for the City-owned property to be <br />acquired by Mn/DOT as R-O-W for the project. <br />6). Work out an agreement with Mn/DOT regarding the installation of a semaphore <br />at the intersection of Highway 12 and Brown Road North on an accelerated schedule <br />to serve the senior housing development. <br />b. Develop a plan for responding to citizen complaints related to the Highway 12 <br />Project <br />1). Determine staff responsibilities and accountabilities. <br />ittMiiliAittii
The URL can be used to link to this page
Your browser does not support the video tag.