My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#2365 Scanned File
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
3750 Bayside Road - 05-117-23-21-0023
>
Land Use
>
98-2365, Subd.
>
#2365 Scanned File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 1:16:02 PM
Creation date
10/9/2025 1:15:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1764 <br />October 9, 1992 <br />Page 3 <br />ch <br />3. Prior to preliminary plat approval by Council, applicant <br />shall declare which of Lots 1 or 2 shall be granted the <br />lakeshore access via Outlet A of Bayside Landing, which will <br />be documented in the final plat resolution. <br />4. All construction shall adhere to the building envelope <br />defined on the survey dated 8-28-92/revised 10-8-92. <br />5. Applicant is advised of Municipal Code Section 10.03, Subds. <br />19, 20, and 21, which define the extent of filling and <br />grading that will be allowed for any residence developed on <br />Lot 2. <br />6. Council should certify which sub-area will be the basis for <br />the sewer connection charge for Lot 2. It is recommended <br />that the previous assessment for one unit as part of the <br />Bayside North sub-area be assigned to Lot 1, and that Lot 2 <br />be subject to a ful 1 unit connection charge as part of the <br />Stubbs Bay Northwest sub-area, to be paid in an amount <br />according to the City fee schedule at the time a building <br />permit is issued for Lot 2. <br />7. Applicant shall grant to the City a 10' bike trail easement <br />over the 10' drainage and utility easement adjacent to <br />Bayside Road, and shall additionally pay the standard park <br />fee less the value of said trail easement. <br />8. Granting of the standard Drainage & Utility Easements along <br />all lot lines (10' along exterior lot lines, 5' along <br />interior lot lines). <br />/
The URL can be used to link to this page
Your browser does not support the video tag.