Laserfiche WebLink
MINUTES OF THE REGULAR ORONO CITY COUNCEL <br />MEETING HELD ON OCTOBER 10, 1994 <br />(#12 - Bangert - Continued) <br />Hurr moved, Goetten seconded, to approve the lot area, width, and hardcover variance <br />noting only the driveway access will be in the right of way. The Council asks the <br />applicant to work with Staff on the tree removal and additional planting. No future <br />variances will be allowed and the Engineer is to look at the driveway configurations prior <br />to final approval. Ayes 4, Nays 0_ <br />MAYOR/COUNCIL REPORT <br />Jabbour reported that the LMCD has a multi -page procedure regarding quiet water. <br />Jabbour informed the LMCD of the need to go through this formal process with regards <br />to Deering Island, <br />ENGINEER REPORT <br />No report at this time. <br />CITY ADMINISTRATOR'S REPORT <br />(*#13) APPOINTMENT OF ELECTION JUDGES FOR GENERAL ELECTION - <br />RESOLUTION #3481 <br />Hurr moved, Jabbour seconded, to approve Resolution #3481 appointing election judges <br />for the 11/8/94 general election. Ayes 4, Nays 0. <br />(*#14) ESTABLISH DATE AND TIME FOR CANVASSING BOARD MEETING <br />Hurr moved, Jabbaur seconded, to approve the date of 11/9/94, at 4:00 p_m., for the <br />1994 Canvassing Board meeting. Ayes 4, Nays 0. <br />(#15) SUMP PUMP INSPECTION ORDINANCE 9129, 2ND SERIES <br />Moorse .reported that this inspection program �rsnto'allof directly connected <br />� the of all homes �� to the sewer. <br />City sewer service to confirm that the sump pump to the sewer <br />The current ordinance prohibits the direct connection of a sump pumpsystem but has no means of enforcement with regard to inspections, a timeline for <br />compliance, or fines. This ordinance would carry a $100/month surcharge for those with <br />sump pumps not in compliance with a 3/l/96 date set for compliance. The inspections <br />will be conducted mainly by in-house staff. If it is found to be needed, additional <br />personnel will be hired to complete the inspections on time. <br />Hurr felt the fines should be charged if the sump pump is not in compliance within 14 <br />days after the inspection. <br />8 <br />