Laserfiche WebLink
oft <br />waivers Isatisfactory to OWNER) of all Liens arising out of <br />or filed in connection with the Work. In lieu thereof and as <br />approved by OWNER, CONTRACTOR may furnish receipts <br />or releases in full. an affidavit of CONTRACTOR that the re- <br />leases and receipts include all labor, services, material and <br />equipment for which a Lien could be filed, and that all pay- <br />rolls, material and equipment bills, and other indebtedness <br />r)nnected with the Work for which OWNER or his property <br />might in any way be responsible, have been paid or otherwise <br />satisfied: and consent of the Surety, it any, to final payment <br />If any Subcontractor, manufacturer, fabricator, supplier or <br />distributor fails to furnish a release or receipt in full. CON- <br />TRACTOR may furnish a Bond or other collateral satisfac- <br />tory to OWNER to indemnify OWNER against any Lien. <br />Final Payment and .4cceptance: <br />14.13 If, on the basis of ENGINEER') observation of <br />the Work during construction and final inspection, and <br />ENGINEER's review of the final Application for Payment <br />and accompanying documentation —all as required by the <br />Contract Documents, ENGINEER is satisfied that the Work <br />has been completed and CONTRACTOR has fulfilled all of <br />his obligations under the Contract Dor:ume: ts, ENGINEER <br />will, within ten days after receipt of the final Application for <br />Payment, indicate in writing his recommendation of payment <br />and present the Application to OWNER for payment. There- <br />upon ENGINEER will gne written notice to OWNFR and <br />CONTRACTOR that the Work is acceptable sub)ect to the <br />provisions of paragraph 14 16. Otherwise, ENGINEER will <br />return the Application to CONTRACTOR, indicating in <br />writing the reasons for refusing to recommend Tina! pay- <br />ment, in which case CONTRACTOR shall make the neces,ar. <br />corrections and resubmit the Application. If the Application <br />and accompar,ving documentation are appropr ate as to form <br />and substance, OWNER shall, within thirty days after receipt <br />thereof pay CONTRACTOR the amount recommended by <br />ENGINEER <br />14.14. If, through no fault of CONTRACTOR, !trial com- <br />pletion of the Work is significantly delayed thereof and it <br />ENGINEER so confirms, OWNER shall, upon receipt of <br />CONTRACTOR's final Application for Payment and recom- <br />mendation of ENGINEER, and without terminating the <br />Agreement, make payment of the balance due for that portion <br />of the Work fully completed and accepted. If the remaining <br />balance to be held by OWNER for Work no! fully completed <br />or corrected is less than the retainage stipulated in the Agree <br />ment, and if Bonds have been luinished as required in para <br />graph S I, the written consent of the Surety to the payment of <br />the balance due for that portion of the Work fully completeu <br />ans.' accepted )hall be submitted by CONTRACTOR to EN- <br />GINELR with the Application for such payment. Such pay- <br />ment had he made under the :erms and conditions governing <br />final payment, except that if shall not constitute a waiver of <br />claims <br />C•ont►acror's Continuing Obligation <br />14 15 CONTRACTOR's obligation to perform and com- <br />plete the Work in accordance with the Contract Documents <br />:3 <br />shall be absolute Neither recommendation of any progress or <br />final payment by ENGINEER, nor the issuance at' a cernfi- <br />cate of Substantial Completion, nor any payment by OWNER <br />to CONTRACTOR under the Contract Documents, nor any <br />use or occupancy of the Work or any part thereof by <br />OWNER, nor any act of acceptance by OWNER nor any <br />failure to do so, nor the issuance of a notice of acceptability <br />by ENGINEER pursuant to paragraph 14 13. nor any correc- <br />tion of defective Work by OWNER shall constitute an accept- <br />ance of Work not in accordance Aith the Contract Document <br />or a release of CONTRACTOR's obligation to perform :he <br />Work in accordance with -h- Contract Documents. <br />Waiver of Claims: <br />Is 16. The making and acceptance of final payment shall <br />constitute: <br />14.16 I. a waiver of all claims by OWNER against <br />CONTRACTOR. except claims arising from unsettled <br />Liens, from defective Work appearing after final inspec- <br />tion pursuant to paragraph la It or from failure to <br />c.,mply with the Contract Documents or the terms of any <br />special guarantees specified therein: however, it shall not <br />constitute a waiver by OWNER of any rights in respect of <br />CONTRACTOR') continuing obligations under the <br />Contracr Documents: and <br />14 16.2. a wailer of all claims by CONTRACTOR <br />against OWNER other than those previously made in %,ic- <br />ing and still unsettled. <br />ARTICLE IS—SUSPENSIONOF WORK AND <br />TERMINATION <br />Owner May Suspend Work <br />15 1. OWNER may, at any time and without causc, sus. <br />pend the Work or any portion thereof for a pert -d of not <br />more than ninety days by notice in writing to CONTRAC- <br />TOR and ENGINEER which sh.11 fix the date on which Work <br />shall be resumed CONTRACTOR shall resume the Rork on <br />the date so fixed. CONTRACTOR will be allowed an increase <br />in the Contract Price or an extension of the Contract Time. or <br />both, directly attributable to am suspension if he makes a <br />Jaini therefor as provided in Articles I I and 12. <br />Owner Wav Terminate <br />15 _ Upon the xzurrence of anv one or more of the <br />following event <br />15 _ I ,f CONTRACTOR is adjudged a bankrupt or <br />insolver;t. <br />15 2.2. if CONTRACTOR makes a general assign- <br />ment for the benefit of creditors. <br />15.1.3. if a trustee or receiver ,s appointed for CO '- <br />TRACTOR or for any of CONTRACTOR', proper: s <br />111111111 <br />