My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-28-1988 Council Packet
Orono
>
City Council
>
1988
>
11-28-1988 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2025 9:46:47 AM
Creation date
10/7/2025 9:37:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OP.^NC PLANNING CVC!IS310N <br />September 19, 1988 <br />side to the northwestern corner of the property, where it <br />_he s_ta cor.-3_ s precc �_.._..t_.; heavy clay and clay/loa-m <br />soils. These soils present severe limitations for the <br />installation and maintenance of on -site sewage disposal <br />3'S r, 3 _''Or_`y c- _ e 5-te is ccve_s-. -v na`,_,rs <br />J _•5Z .. . �.. ......J <br />-,a::_a for:st, a_=hough a s: = __cant stand of conJfer=us <br />-----es are also pre3ent which were planted cv Sid P.ebers. <br />3. Comprehensive Plan Relationships, Zoning issues: <br />As the Planning Commission is well aware, the Subject <br />Property is located within the Highway 12 Corridor Study <br />Area. Since that study was adopted by the City as a <br />formal amendment to the Comprehensive Plan, to Planning <br />Commission should refer to that document for review of <br />pertinent comprehensive planning issues. This property is <br />discussed or. pages 49 throug.• 5Z . <br />This application includes only the northern portion of the <br />alt::ough some -el_..._nar s :et=tes gave been <br />.. Site, <br />shared with the City that illustrate the future <br />development of the southern portion as well. The Highway <br />12 Corridor Study anticipated tte development of <br />single-family residential jots on the northern portion of <br />the site and that is what is being applied fir in this <br />request. The recommended alternative states that the <br />density should not exceed 25 lots, which is the number <br />shown on the proposed plat. Therefore, at the most basic <br />level, this request is consistent with the Comprehensive <br />Plan. <br />The remainder of the discussion in the Corridor Study <br />forused on traffic and stormwater management issues. Both <br />of those issues will be addressed at the point at which <br />the southern portion of the site is developed. <br />The area contained within the Highway 12 Corridor Study is <br />subject to the proposed Special Minimum Requirements for <br />Rezoning that have been reviewed by tte P:anninq Commission and <br />be re•; iecaed by tte _it Ccunc_1 3t an upcom_nq meeting. <br />Although these minimum requirements have not yet been forma =y <br />adopted by the City Council, they are summarized in the <br />following paraarapns, along with a dizc::saion of ::cw they are <br />proposed to be met by this request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.