Laserfiche WebLink
Zoning File 01618 <br />March 13, 1991 <br />Page 6 of 6 <br />- Define each building pad or homesite. Within each <br />pad define the 75' setback line. <br />- Provide detailed to -scale drawings of each building <br />pad showing access drives and outline of principal <br />structure. <br />Based on final recommendation of Planning Commission <br />regarding options for determining allowed hardcover for <br />each pad, applicant shall provide a break -down of <br />hardcover within each site plan. <br />- Preliminary subdivision should show extended sewer <br />line within southern shoreline. <br />6. Applicant will be responsible for the demolition of the <br />accessory stru cures on the property prior to final plat <br />approval. Applicant should consult with staff regarding the <br />removal/burning of debris and piles of rubbish on the site. <br />