Laserfiche WebLink
� °� <br /> i 0 � � � <br /> - � . CITY of ORONO <br /> ,� . ,. � <br /> ,t ti <br /> �'.� p'�' RESOLUTION OF THE CITY COUNCIL <br /> ��kESI3�g'� NO. �I � � �, <br /> fl Developer shall provide record plan sets for all utility construction in a timely <br /> manner. . <br /> 5. Wetland Impacts <br /> a) Orono's 26'wetland setback requirement(Zoning Code Section 10.55,Subd. <br /> 8) which disallows filling, grading, dredging, excavation, hardcover, <br /> _ temporaryorpermanent structures,obstructions,septic systems,wells or other <br /> construction, is in effect on the site. Final grading and site plans, Sheets <br /> C3.1 through C3.10 and C2.1, indicate those locations where grading or <br /> filling within the 26'setback is necessary to accomplish the Plan. <br /> b) A variance to Section 10.55, Subd.8 is hereby granted to allow the minimal <br /> filling within the 26'wetland setbacks where buildings abut the 26' setback <br /> • line as shown on the approved plan sheets. A wetland setback variance is <br /> hereby granted for encroachment of buildings,retaining walls,roadways,trails <br /> and hardcover within the 26'wetland setback as depicted on Sheets C2.1 and <br /> . C3.8 through C3.10. <br /> c) The City specifically acknowledges that 1.OS acres of Cityprotected wetland <br /> are to be filled or otherwise impacted as part of the project. The Developer <br /> shall complywith all requirements of the MCWD in regards to mitigation and <br /> protection of wetlands on the site. � <br /> 6. Grading,Erosion Control <br /> a) . Erosion control shall adhere to "Best Management Practices for Protecting � <br /> Water Quality in Urban Areas". � <br /> b) The Developer shall comply with all conditions enumerated in the Erosion <br /> Control memo by Bonestroo &Associates dated October 3, 2002. <br /> c) All erosion control measures.as required by the City and the MCWD shall be <br /> in place, inspected and approved by the City Engineer prior to commencing � <br /> excavation on the site. <br /> • d) All such erosion control measures shall be maintained in working order prior <br /> to,during and after the project until released by the City Engineer, subject to <br /> weekly inspection or as necessary until the site is revegetated. <br /> Page 10 of 18 <br />