Laserfiche WebLink
DATA <br />CuMPILATION <br />BY LOT <br />Average perc. <br /># of <br />Average <br />Depth to <br />Reco±ri-*ended <br />� <br />rate <br />holes <br />slope <br />mottling <br />GysLem <br />m <br />1 <br />A <br />Lot <br />1, <br />Block <br />1 <br />Primary <br />3 <br />mpi <br />4 <br />0-3 % <br />2.5 <br />ft. <br />Hound <br />Secondary <br />52 <br />mpi <br />2 <br />0-3 % <br />1.7 <br />ft. <br />Hound** <br />c <br />Lot <br />2, <br />Block <br />1 <br />eximary <br />9 <br />mpi* <br />3 <br />0-? % <br />2.2 <br />ft. <br />Mound <br />Secondary <br />59 <br />mpi <br />2 <br />0-2 % <br />2.0 <br />ft. <br />Mound <br />�'• <br />m <br />Lot <br />3, <br />Block <br />1 <br />Primary <br />18 <br />m; i* <br />3 <br />4-6 % <br />1.5 <br />ft. <br />Mound** <br />0 <br />o <br />Secondary <br />11 <br />mpi <br />2 <br />8-10 % <br />1.5 <br />ft. <br />Hound** <br />-• <br />Lot <br />4, <br />Block <br />1 <br />Primary <br />12 <br />mpi <br />a <br />6-8 % <br />2.8 <br />ft. <br />Mound <br />Secondary <br />28 <br />mpi <br />t <br />5-7 % <br />2.0 <br />ft. <br />Mound <br />Lot <br />5, <br />Block <br />1 <br />Primary <br />14 <br />mpi <br />4 <br />6 % <br />2.7 <br />ft. <br />Mound <br />Secondary <br />148 <br />mpi <br />2 <br />2-3 % <br />2.0 <br />ft. <br />Mound /1 <br />Lot <br />6, <br />Block <br />1 <br />Primary <br />39 <br />mpi* <br />3 <br />2-4 % <br />2.4 <br />ft. <br />Mound <br />Secondary <br />20 <br />mpi* <br />1 <br />2 % <br />2.5 <br />ft. <br />Mound <br />Iot <br />7, <br />Block <br />1 <br />Primary <br />87 <br />mpi* <br />3 <br />2-3 % <br />2.5 <br />ft. <br />Mound <br />Secondary <br />135 <br />mpi <br />2 <br />2 % <br />2.5 <br />ft. <br />Mound /1 <br />Lot <br />1, Block 2 <br />Primary <br />73 mpi* 3 <br />0-2 % <br />2.7 ft. <br />hound <br />f1 V <br />d,er& <br />SL.:ondary (a) <br />54 mpi* 1 <br />0-2 % <br />2.2 ft. <br />Hound <br />ub Z <br />Secondary (b) <br />84 mpi 2 <br />0-2 % <br />--- <br />Mound 4 <br />Lot <br />2, Block 2 <br />Primary <br />63 mpi 4 <br />0-2 % <br />2.3 ft. <br />Mound <br />Secondary <br />84 mpi* 1 <br />0-2 % <br />2.0 ft. <br />Mound <br />* <br />Average perc <br />rate is based <br />on one additional test <br />hole which <br />did not per -,.late <br />fast enough to be measurable, hence average may be somewhat hirjher. <br />** <br />Mound system <br />should have at <br />least 24" sand base. <br />Due to high <br />water tables, <br />all <br />other mounds <br />noted on Cris <br />page ahould have a'- least <br />18" sand <br />base. <br />/1 <br />Average percolation rate is <br />higher than normally <br />allowed for <br />a mound system <br />by code. <br />well OPI-1-- <br />t <br />1 <br />