My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
09-28-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/22/2025 11:45:07 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/28/1988
Retention Effective Date
9/22/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4188.4 / S <br />TO: Mayor and City Council <br />FROM: Mark Bernhardson, City Administrato01 <br />DATE: April 1, 1988 <br />SUBJECT: City Facility Study <br />Attachments: A. Facilities Memo Dated 9/15/86 <br />ISSUE - <br />i. Present information regarding current steps being taken in <br />relationship to the site evaluation. <br />2. Presentation of a review process of the site evaluation and <br />criteria development. <br />INTRO_DU__CTIO_N_ - At the Council's February 8, 1998 meeting the <br />Council accepted the information regarding the first phase of the <br />study and undertook the second phase of the study which was a <br />site evaluation of two alternative sites. The firm doing the <br />site analysis has reviewed both sites and in light of the space <br />study, has been developing block diagrams to see how they <br />coordinate with the site together with selected setback and site <br />needs. Staff has presented the consultant with as much <br />documentation as it has available on the two sites. <br />DISCUSSIO <br />N - The primary focus at this meeting is on Issue 2 to <br />_ <br />determine a process that the Council w,,uld like to have <br />undertaken during this site analysis phase. The principal goals <br />of this review are the following: <br />a. Development of criteria for site analysis of the <br />facility (regardless of location). <br />b. Review of the preliminary sites taking comments from <br />the persons _evolved in the process as to particularly <br />land use issue., ai— zoning requirements. <br />In addition to Council and staff participation in this matter <br />there has been expressed desire on the part of the Planning <br />Commission, with concurrence by Council and staff, that Planning <br />Commission be involved in thi,; site evaluation process to lend <br />particularly their land use expertise in the siting criteria. <br />The consultant is developing draft criteria plus layout block <br />schemes on each of the sites being studied which will be the <br />subject of the reveiw at this point by >_.iose involved. <br />ALTE_RN_A_TIV_E_S - <br />l. Information presented <br />a. Accept <br />b. Table <br />
The URL can be used to link to this page
Your browser does not support the video tag.