My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1376 Baldur Park Road - 08-117-23-31-0005
>
Land Use
>
88-1280, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2025 9:35:23 AM
Creation date
9/18/2025 9:31:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTRb GP THR PLAMING COMMISSION M'EF ItG HELD JUNE 6, 1988 <br />#1277 BIG ISLAND BOARD OF GOVERNORS CONTINUED <br />It was mcvii by B- flows, seconded by Johnson, to <br />recommend approval the conditional use permit for <br />phase 2 per staff : mmer.dations 1-9, subject to the <br />4'x 8' and 8'x 8' car signs be reduced in size to meet <br />the sign standards for commercial sites and be located <br />75' from the lakeshore and that the 3'x 5' camp rules <br />sign be placed by the dock. Motion, Ayes 4, Nays 0. <br />#1278 WE TIM <br />4496 MOSTS OBOES DRIVE <br />VARIAMCS <br />POSUC HAA1tING <br />The Affidavit of Publication and Certificate of Mailing <br />were r.oted . <br />There were no comments fron, the public rep ing this <br />matter. <br />Due to the absence of the applicant or a representative, <br />it was moved by Kelley, seconded by Bellows, tc table <br />Application 11278. Motion, Ayes 4, Nays 0. <br />91Z60 NESDT L. WINE <br />13Tt7 PARE ROAD <br />AEIAWZ <br />PUBLIC SEARIOG 9:01-9:37 <br />The Affidavit <br />were noted. <br />0. . <br />of Publication and Certificate of Mailing <br />Wendy Weihe and her architect were present for this <br />matter. <br />Me. Weihe reviewed her request for hardcover and <br />lakebhore setback wariantes to construct major additions <br />to the existing residence. She stated tbut the proposal <br />Is the only alternative to sc lving the apace problem <br />noting that due to water problems, she cannot make <br />improvement to the basement area. <br />Walley noted that although the shows a slight <br />decrease in both the 0-75' and i5C'' zones, the <br />proposal involves adding structural _ dcover, <br />Bellows questioned the structural integrity of the <br />existing structure to support the proposed additions. <br />Ms. Neihe stated that they pu•paeely -)reed the proposed <br />additions out so that the existing structure could <br />support Lhe additions. <br />Kelley felt the structural hardcover exce ••e. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.