My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
09-12-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/16/2025 1:34:02 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/12/1988
Retention Effective Date
9/16/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
493
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6788.5 <br />TO Mayor and City Council <br />)p <br />FROM: Nark Bernhardson, City Administrator <br />DATE: June 7, 1988 <br />SUBJECT: Bohns Point - Request for Feasibility study <br />) k jewo (6 v r 13 <br />Attachments: A. Petition from Bohns Point Neighbors Received <br />6/7/88 <br />B. Map of Area/Designating Signee's Property <br />C. Proposed Resolution Ordering Preparation of <br />Report <br />ISSUE - <br />1. Determine if the Council desires to undertake a feasibility <br />study based on the attached petition. <br />2. Determine what interest the Council has, if any, on the <br />pubic takeover of Bohns Point Circle, which is currently <br />privately owned but publically maintained. <br />INTRODUCTION - The City is in receipt of Attachment A, petition <br />regarding an upgrade to Bohns Point Road. Part of the <br />improvement would be to expand the current width of 20 feet to an <br />expanded width of 22 feet. As noted the Circle is presently <br />privately owned but publically maintained with the City having <br />easements for sewer and water around the circle. <br />DISCUSSION - <br />1. Feasibility - As indicated by the City Engineer it is <br />estimated that the feasibility study for widening the project and <br />the necessary overlay will cost, about 51,000 together with an <br />additional $1,000 to do the soil borings. The number of owners <br />abutting is 21 representing 51% of the street frontage. <br />2. Public Takeover - Should the Cicy choose to do any public <br />work on the Circle portion of the road the City would by <br />necessity have to take it over. <br />ALTERNATIVES <br />Issue 1. Feasibility <br />A.�Undertake <br />B. Amend the scope and undertake <br />C. Table <br />D Choose not to undertake <br />
The URL can be used to link to this page
Your browser does not support the video tag.