Laserfiche WebLink
While a number of these issues will need to be addressed during <br />the process, initiation of suc! :ocess will require local <br />support. If the local sup; �t forthcoming and the <br />political impact is not made on t;: cate level regarding this <br />corridor, no improvement of any type will be made. Even if the <br />corridor selection process were to be undertaken now, it would <br />take approximately 10 years, if things went correctly, before any <br />substantial work would be done in the area. If nothing is done <br />in the corridor the traffic will continue to build and as there <br />are few other parallel routes in the area the traffic generation <br />will build to the point that substantial slow downs, stopages and <br />frustration will occur. (As noted on places such as Highway 5, <br />clogged highways do not discourage people for using them.) <br />5 <br />