Laserfiche WebLink
To: <br />From: <br />Date: <br />�3 <br />(ING <br />J UFJ 13 1:; _,,3 <br />Planning Commission Chairman Kelley <br />Orono Planning Commission Members <br />City Administrator Bernhardson <br />Jeanne A. Mabusth, Building & Zoning Administrator <br />May 31, 1988 <br />Subject: #1285 Eric Paulson, 2605 Map1E <br />- Public Hearing Resolution <br />Eoninq District - LR-lB <br />Total Area = 1+ acres <br />dge Lane - Conditional Use Permit <br />Pertinent Ordinances <br />1. Section 10.55, Subdivision 9 (B) Floodway district conditional uaes, <br />t3 All permanent boat docks or other similar structures. <br />2. Section 10.55, Subdivision 11 Standards for floodway and flood fringe <br />conditional uses A, B, and C. <br />3. Section 105.55, Subdivision 12 (C and D) - EnQ_;ne:rs review and other <br />standards for the City's consideration. <br />4. Section 10.55, Subdivision 14 Suggested .:onditions attached to <br />Conditional Use Permits. <br />List of Exhibits <br />Exhibit <br />A <br />- Application <br />Exhibit <br />B <br />- Property Owners List <br />Exhibit <br />C - <br />Plat Map <br />Exhibit <br />D <br />- Site Plan <br />Exhibit <br />E <br />- Dock Detail <br />Exhibit <br />F <br />- Survey <br />Review of Application <br />The applicant seeks a Conditionnl Use Permit for a permanent dock 40' in <br />length to be constructed on the shoreline of Lafayette Bay. This is the <br />first time staff has requested a Conditional Use Permit application for <br />construction of a permanent dock. Section 10.55, Subdivision 9, B,-(3) has <br />been part of the Municipal Code since January 11, 1979. In the past, staff <br />has issued building permits subject to the appropriate DNR permit being <br />issued. As a permanent dock is a permitted use with a Conditional Use <br />Permit, there is no need to dicuss the question of hardships, although in <br />earlier discussion with Mrs. Paulson she advised that the wage action is <br />very severe along this portion of the shoreline. The shoreline has already <br />been rip -rapped. <br />Review Exhibits D and E. The structure meets all required side setbacks <br />for 40' length dock. <br />Dock sections 0-50' in lengt? <br />Required side setback = 10' <br />Proposed west side = 116' <br />Proposed east side = 35' <br />Per Exhibit E, no dock section <br />established by the LMCD ordinances. <br />exceeds the maximui:. -iwed 6' width <br />