My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 1st series - 151 - 253
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 1st Series (1-150 Microfiche)
>
Ordinances 1st Series 150 - 253
>
Ordinances 1st series - 151 - 253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2015 12:34:11 PM
Creation date
9/4/2025 3:21:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) Adversely affects the benefits and desirability of <br /> occupancy; <br /> (2) Diminishes the stability and taxable value; <br /> (3) Prevents the most appropriate use of real �state and <br /> resources and the most appropriate development; <br /> (4) Produces degeneration of property; <br /> (5) Produces adverse conditions on �he publi� health, <br /> safety and welfare. <br /> 34. 97�5 The Planning Commission and City Council may from time <br /> to time amend or vary the application and review procedures <br /> and the amount and type of documents to be presented. <br /> 34 . 976 Final Plan Review. <br /> (a) Before a Building Permit is issued for any structures <br /> within the proposed site, Final Plan of one or more <br /> stages in accordance with Buildzng Permit requirements and <br /> requirements contained in this section, shali be su�mitted <br /> to the Planning Commission for rev�ew and recommendation and <br /> to the City Council for ap�roval . <br /> (b) ° A Final Plan snall be sub��itted with an applicatian for <br /> Final Plan approval �•�ithin ninety (90) days after City <br /> Counci pl a groval of the Preliminary Pian unless a written <br /> request for an extension is su�mitted by the appiicant. <br /> If an application for final approval or a request far an <br /> extension is not received with ninety (90} days, the <br /> Preliminary Plan will be considered abandoned and a new <br /> application for a Preliminary Plan must be submi.tted fQllo��v- <br /> ing the Preliminary Pian procedure. There shall be maxiraum <br /> extensions of not more than one (1) year. <br /> (c) The application for Final Plan (ar for any stages of <br /> the Final Plan) approval shall be accompanied by a legal <br /> description of the total property together with copies of the <br /> following plans and data: <br /> (1) A plan with locations of all structures including <br /> placement, size and type with existing topography <br /> showing two foot contour intervals or spot elevations <br /> on a one hundred (100) foot grid if such contours <br /> are over one hundred (100) feet apart. <br /> (2) Final architectural plans as required for building <br /> permit application. Plans for detached single family <br /> dwellings may be submitted directly to the Building <br /> -14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.