Laserfiche WebLink
County Road 15 <br />Lighting and Financing <br />March <br />21, 1988 <br />Page <br />3 of 4 <br />(Annual Cost/General) <br />Special <br />General Fund (10 r 6.5%) <br />Assessment <br />it <br />384,000 <br />53,500 <br />97,000- <br />12 <br />284,000 <br />40,435 <br />97,000 <br />3 <br />184,000 <br />25,600 <br />97,000 <br />4 <br />100,000 <br />13,900 <br />97,000 <br />5 <br />J <br />0 <br />97,000 <br />ALTERNATIVES - <br />Issue 1 Street Lighting <br />a. City owned street lighting <br />Adopt <br />Amend and adopt <br />Table <br />Reject <br />b. Consulting design engineer <br />Appoint <br />Table <br />c. Financing <br />Adopt recommendation <br />Amend and adopt <br />Table <br />Reject <br />Municipal <br />(Est. <br />State Aid <br />Net Loss of MSA) <br />0 <br />0 <br />100,000 <br />(14,200) <br />200,000 <br />(21,750) <br />284,000 <br />(30,800) <br />384,000 <br />(42,000) <br />Issue 2. Method of Financing - County Road 15 Sources <br />Adopt recommendation, order feasibility, and set hearing schedule <br />T.11ocations <br />Amend and adopt <br />Table <br />Means of Financinq <br />Finance through MSA <br />Internal sources <br />RECOMMENDATION - <br />Issue 1 - Street Lighting <br />a. Type of Lighting - It is recommended that the City go with the City <br />owned l ghtinq to replace the existing wooden poles. <br />b. Consultant - Consulting Design Engineer It is recommended that <br />the CRY go with Robert Ellers in conjunction with the City of Spring <br />Park to do the design of the project. <br />C. Method of Financing - It is rec r)mmen-led that the City assess ths, <br />tot a TW" TTM . <br />