My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Untitled
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2350 Watertown Road - (NO PID)
>
13-3595, Sketch Plan
>
Untitled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 2:15:29 PM
Creation date
8/28/2025 2:15:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PC Exhibit F <br /> Oliver Hill—2350 Watertown &PID 34-118-23-33-0055 <br /> #13-3595 <br /> Summary Estimate of Fees* <br /> Preliminary Subdivision Plat Application: <br /> Preliminary Subdivision Application $850+$30/lot <br /> Rezoning RPUD $35/dwelling unit <br /> Proposed Private Road $650+$0.50/lineal foot <br /> or <br /> Proposed Public Road $950+$0.50/lineal foot <br /> Proposed Sanitary Sewer Main Extension $275+$25/stub <br /> Application Escrow (guarantees payment of City's consultant costs) $10,000 <br /> Estimated cost of City Engineer's review of preliminary plat $4,500 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Plat Application: <br /> Final Subdivision Application, including Legal Review and Filing <br /> (w/covenants) (Covers first review of documents, if additional time is <br /> required, those costs will be billed to the property owner.) $700 <br /> Sewer Connection (Orono project 73-1A) $16,720/unit-likely waived due to developer-installed laterals <br /> Long Lake Sewer& Water Water and Drainage Tonnection runk Fee Charges \\ \\\�``\\������` $ (Confirm with Long Lake) <br /> Storm <br /> $5,765/ac x 4.8 acres=$27,672 <br /> (paid for the entire plat) <br /> Park Fee (8%of Fair Market Value), but no less than <br /> $3,250/per lot and no more than $5,550 per lot x#of new lots $5,550/lot <br /> Estimated cost of City Engineer's review of final plat $500.00 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Application Fee is paid with the Final Plat application. Storm Water and Drainage Trunk Fee, Park <br /> Fee, Sewer and Water Connection Charges and consultant costs are paid before the final plat is recorded. <br /> *Based on 2013 Fee Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.