Laserfiche WebLink
• PC Exhibit F <br /> Oliver Hill—2350 Watertown &PID 34-118-23-33-0055 <br /> #13-3595 <br /> Summary Estimate of Fees* <br /> Preliminary Subdivision Plat Application: <br /> Preliminary Subdivision Application $850+$30/lot <br /> Rezoning RPUD $35/dwelling unit <br /> Proposed Private Road $650+$0.50/lineal foot <br /> or <br /> Proposed Public Road $950+$0.50/lineal foot <br /> Proposed Sanitary Sewer Main Extension $275+$25/stub <br /> Application Escrow (guarantees payment of City's consultant costs) $10,000 <br /> Estimated cost of City Engineer's review of preliminary plat $4,500 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Plat Application: <br /> Final Subdivision Application, including Legal Review and Filing <br /> (w/covenants) (Covers first review of documents, if additional time is <br /> required, those costs will be billed to the property owner.) $700 <br /> Sewer Connection (Orono project 73-1A) $16,720/unit-likely waived due to developer-installed laterals <br /> Long Lake Sewer& Water Water and Drainage Tonnection runk Fee Charges \\ \\\�``\\������` $ (Confirm with Long Lake) <br /> Storm <br /> $5,765/ac x 4.8 acres=$27,672 <br /> (paid for the entire plat) <br /> Park Fee (8%of Fair Market Value), but no less than <br /> $3,250/per lot and no more than $5,550 per lot x#of new lots $5,550/lot <br /> Estimated cost of City Engineer's review of final plat $500.00 <br /> (Actual cost will be billed to property owner) <br /> Final Subdivision Application Fee is paid with the Final Plat application. Storm Water and Drainage Trunk Fee, Park <br /> Fee, Sewer and Water Connection Charges and consultant costs are paid before the final plat is recorded. <br /> *Based on 2013 Fee Schedule <br />