Laserfiche WebLink
9 12.30 <br />4. Site limitations including soil <br />characteristics and lot size may require Alternative System design <br />for the repair, alteration, extension or replacement of existing <br />systems, or for the construction of new systems on lots of record <br />as of the date of adoption of this Section. In such cases, the <br />city shall have authority to approve, conditionally approve or <br />disapprove the proposal. <br />5. Subdivision proposals may include <br />Alternative Systems for one or more proposed lots. In such cases, <br />the City's re ,iew and recommendations shall be forwarded to the <br />Planning Commission and Council for inclusion in the review of the <br />preliminary plat. The Council may approve, conditionally approve <br />or disapprove of the proposal and may require that the proposed <br />subdivision be redesigned to reduce or eliminate the use of <br />Alternative S stems. <br />E. Building Permit Applications. No building <br />permit shall be issued by th,� City for any new building which will <br />be connected to a new on -site system until the site evaluation <br />report and system design specifications as required the Design <br />Manual have been reviewed and approved by the City. No building <br />permit or plumbing permit shall be issued by the ity for any <br />expansion or alteration of a building or use connected to an <br />existing on -site system, until such system has been inspected and <br />certified by the City as being in compliance with this Section. <br />Whenever the addition of bedrooms or plumbing fixtures, or a change <br />in the character or intensity of the established use is proposed, <br />the City may require the review and/or replacement, repair, <br />alteration or expansion of the existing system or any portion <br />thereof <br />F. Subdivision Applications. No subdivision, lot <br />division or replatting for the purpose of creating a new building <br />site, which property includes the use of on -site systems, shall be <br />approved by the City until a site evaluation report as required by <br />the Design Manual has been reviewed and approved by the City, and <br />all existing systems have been inspected and certified by the City <br />as being in compliance with this Section. <br />1. Wherever the site evaluation report indi- <br />cates slopes in excess of 12%, or percolation rates slower than 60 <br />minutes per inch, or ground water table less than five feet deep, <br />or soil classifications requiring the use of Alternative Systems, <br />the site evaluation report shall also include specific system <br />design specifications as normally required for building permit <br />applications. <br />2. As part of any subdivision, the owner shall <br />grant to the City in a form approved by the City a perpetual right <br />of entry to allow for the future inspection of all systems, which <br />right of entry may be filed in the chain of title for the property. <br />ORONO CC 494 (4-1-84) <br />