Laserfiche WebLink
we would need easements from two or three property <br />owners. <br />C. Construct an overflow at the outlet end of the <br />culvert under Highwood Road approximate cost <br />$500.00. <br />D. Burming of properties most directly affected by <br />the ponding <br />E. Restriction of flow at culvert on 19 <br />F. installation of a manhole on the current line <br />together with an overflow at point shown on <br />Attachment G <br />G. Road drainage <br />1. raising to direct flowage <br />2. lowering to direct flowage <br />Issue 4. Process of Protect <br />-- - -- --- --- -- --- <br />1. Direct the process be undertaken <br />2. Alter the process and adopt <br />3. Table <br />4. Undertake <br />Issue 5. Preliminary Financing <br />A. Do as a storm sewer assessment <br />B. Do as a storm water district <br />C. Table <br />D. Choose not to undertake <br />RECOMMENDATION - It i;, recommended that the Council conduct the <br />public hearing and continue that public hearing to the meeting of <br />May 25th at which time it is recommended that Council consider <br />the issues of whether Council wants to undertake the project, the <br />means to undertake it, the process by which it is being done and <br />the financing. <br />PROPOSED MOTIOP, - Moved by , seconded by , that the Council <br />following preliminary discussion and continuing the public <br />hearing defer further discussion to May 25, 1988 leaving the <br />record open and that Council undertake discussion of the balance <br />of the items related to this issue. Ayes --, Nays _ <br />4 <br />