My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-13 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2900 Deer Run Trail - 04-117-23-24-0021
>
Septic
>
1993-12-13 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 12:16:15 PM
Creation date
8/20/2025 12:09:03 PM
Metadata
Fields
Template:
x Address Old
House Number
2900
Street Name
Deer Run
Street Type
Trail
Address
2900 Deer Run Trail
PIN
0411723240021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DESIGN WORKSHEET <br />(For Flows up to 1200 gpd) <br />A. FLOW <br />Estimated 0S0 gpd (seepages D-7 or I-3, 4, 5) <br />or measured - gpd x 1.5 = <br />B. SEPTIC TANK LIQUID VOLUMES <br />gallons (seepages C-3 or C- 5) <br />C. SOILS (refer to site evaluation) <br />1. Depth to restricting layer = -Aq" le 30il inches <br />2. Depth of percolation tests = 1 a" inches <br />3. Percolation rate 6. CY mpi <br />4. Land slope S % <br />D. ROCK LAYER DIMENSIONS <br />1. Multiply flow rate by 0.83 to obtain required area of rock <br />layer: Daily Flow x 0.83 = <br />,)�v gpd x 0.83 sq. ft. / gpd =ya sq. f t. -i ► o'%, <br />2. Select width of rock layer (10 feet or less) _ �.. 0 ft. <br />3. Length of rock layer - Area + Width = <br />LK4 sq. ft. + /_ ft. = G V ft. <br />Eaiwwd Uwase Flom is COMB Fa Jay <br />care► <br />a1 <br />T$ as I <br />Ty" II <br />Typr III <br />ry <br />t2S <br />too <br />'00 <br />214 <br />tw <br />2% <br />.too <br />294 <br />I <br />332 <br />Tr L <br />370 <br />L <br />4 <br />.r+. <br />t w �.. <br />770 <br />1123 <br />• r • <br />IOO <br />1lIIO <br />•�4 <br />1C <br />wo <br />7.e.+ <br />n» <br />xco <br />t, Sd1.l <br />E. ROCK VOLUME <br />1. Multiply rock area by rock depth to get cubic feet of rock; <br />(I sq. ft. x L. - ft. _ ?1 �d cu. ft. <br />2. Divide cu. ft. by 27 cu. ft./cu. yd. to get cubic yards; <br />aL� cu. ft. + 27 = cu. yd. <br />3. Multiply cubic yards by 1.4 to get weight of rock in tons; <br />-J,-1 cu. yd. x 1.4 ton/cu. yd. = 2_V tons. <br />F. ADSORPTION WIDTH 4-`�44 A"i <br />1. Percolation rate in top 12 inches of soil is mpi <br />2. Select allo.irable soil loading rate from table on page E-; <br />, 4 gpd/ft' <br />3. Calculate adsorption width ratio by dividing rock layer <br />loading rate of 1.20 gpd/ft2 by allowable soil loading rate, <br />1.20 gpd/ft2+ .. W� gpd/tt' = 3 <br />Check this value on page E-I6. <br />4. Multiply adsorption width ratio by rock layer width to get <br />required adsorption width; <br />2.G,) x 9 ft = 1 ft <br />Pock Bed <br />3 sFidth 11011. <br />,r•r�r��r:r� � _}r �: r ri <br />1-- lenalh <br />Ab9"iM WWlh SWf T ble <br />PwoNwa.11n <br />Soil T.uwa <br />Ce1ew <br />:f;ha <br />iteeio of <br />AMuple aYMM,Omp <br />wiM <br />F~ dre 0.1 <br />Comm Sews <br />& I IDS <br />Sad <br />1.20 <br />to <br />0.1195 S •• <br />roue Saw •• <br />a60 <br />2.110 <br />610IS <br />S.efylaw <br />0.1,11 <br />132 <br />161030 <br />Loew <br />0.N <br />2A0 <br />311045 <br />Sib law <br />2.e0 <br />N n f0- <br />a* 120 <br />Cloy Lore <br />tl+y <br />74 <br />ZA7 <br />5.10 <br />Sloe duw <br />Clay <br />-- <br />--- <br />I30•• <br />
The URL can be used to link to this page
Your browser does not support the video tag.