My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ._,4`r. <br />.t: r CITYof ORONO <br />Pat Office Bm Ga•CryWI Bay, Miaaauufa &"Ve Munfaaal COMM <br />It <br />On the North Shore of Lake Minnetonka <br />December 5, 1985 <br />Mr. Glenn Cook <br />BOnestroo, Ro:ene <br />2335 W. Trunk Hwy 36 <br />St. Paul, MN 55113 <br />Re: MACC Project 86-S1/Orono Interceptor Improvements <br />Dear Glenn, <br />Having reviewed the intent of the project referenced above <br />together with your proposal the selection of Boneattoo <br />as the engineer on the project would be of benefit to Orono in <br />many ways, as it would bring to bear your experience with the <br />Orono system together with the desires and needs of Orono for <br />improvements including the proposed telemetry system. <br />There is however, two areas of concern, in that the <br />improvements may entail the replacement of existing forcem3in <br />piping, which was originally put in as part of the original Orono <br />sewer system. Being fully cognizant of the fact that there are <br />time, that the system has overflowed causing sewage to flow both <br />into basements ane also raw sewage into Lake Minnetonka, there is <br />very possibly the need beyond lift station improvements to handle <br />the current capacity in the lines. While it may be appropriate <br />that the size of the pipe could or should be Chang-d, I do see a <br />potential conflict in two regards as they relate to Bonestroo <br />being both City Engineer and also the selected Engineer on behalf <br />of MWCC for those improvements. They are as follows: <br />To the extent that there is needed a decision or <br />recommendation regarding replacement of the pipe that <br />the interests of Orono and MWCC may be in coot 14et as to <br />whether changes in lift stations and telemetry v uld <br />alleviate the problem at a lesser cost than actual <br />replacement of the pipe or if both are needed in order <br />to accomplixh alleviation of existing problems. <br />b. To the extent a recommendation needs to be made <br />regarding the sizing of the pipe there could be a <br />difference as to the size based on the divergent goals <br />betwern MWCC and Orono. <br />ale LMbr:arfplwf:-O)+19r • enwrrmn anenaflVanrl-xfLr wa • fl'tl rfraaU -ONW <br />aarestwa: <br />
The URL can be used to link to this page
Your browser does not support the video tag.