Laserfiche WebLink
COST ESTIMATE ALTERNATE NO. 4 <br />I <br />ITEM <br />POLES 6 FIXTURES (250 WATT) <br />POLES be FIXTURES (150 WATT) <br />BASES <br />WIRE <br />CONDUIT <br />CONTROL CENTERS <br />QUANTITY <br />7 EA 0 <br />13 EA q, <br />20 EA fJ <br />25,700 LF 0 <br />600 LF 0 <br />2 EA 0 <br />CONTINGENCIES <br />TOTAL ESTIMATED CONSTRUCTION COST <br />UNIT PRICE <br />$1,100.00/EA <br />1,000.00/EA <br />550.00/EA <br />1.25/LF <br />7.20/LF <br />2,100.00/EA <br />ENGINEERING, LEGAL, FISCAL AND ADMINISTRATIVE COST <br />TOTAL ESTIMATED COST ALTERNATE NO. 4 <br />PROPOSED ASSESSMENT <br />METHOD A — 40% OF THE TOTAL COST ASSESSED TO PRIVATE PROPERTY <br />AMOUNT TO BE ASSESSED <br />COST PER FOOT FOR COMMERCIAL PROPERTY <br />COST PER FOOT FOR RESIDENTIAL PROPERTY <br />METHOD B — 50% OF THE TOTAL COST ASSESSED TO PRIVATE PROPERTY <br />AMOUNT TO BE ASSESSED <br />COST PER FOOT FOR COMMERCIAL PROPERTY <br />COST PER FOOT FOR RESIDENTIAL PROPERTY <br />METHOD C — 60% OF THE TOTAL COST ASSESSED TO PRIVATE PROPERTY <br />AMOUNT TO BE ASSESSED <br />COST PER FOOT FOR COMMERCIAL PROPERTY <br />COST PER FOOT FOR RESIDENTIAL PROPERTY <br />TOTAL <br />$ 7,700.00 <br />13,000.00 <br />11,000.00 <br />32,125.00 <br />_ 4,320.00 <br />4,200.00 <br />7,235?00 <br />$ 79,580.00 <br />19,900.00 <br />$ 99,480.00 <br />$ 39,792.00 <br />$ 9.12 <br />$ 6.08 <br />$ 49,740.00 <br />$ 11.39 <br />$ 7.59 <br />$ 59,680.00 <br />$ 13.67 <br />$ 9.11 <br />t/ P0? <br />