My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
02-22-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/18/2025 10:02:19 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
2/22/1988
Retention Effective Date
8/18/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I - <br />NENNEPIN <br />U U <br />DEPARTMENT OF TRANSPORTATION <br />320 Washington Av. Scuth <br />Hopkins, Minnesota 55343-8468 <br />935-3381 <br />TTY 935-6433 <br />January 8, 1988 <br />Ms. Jeanne A. Mabusth <br />Building & Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />Dear Ms. Mabusth: <br />JAN � � l9►88 ��'' I <br />I <br />RE: Proposed Site Revision - Navarre Dairy Queen <br />CSAH 15-North side, approximately 100 feet east of Blaine Ave. <br />Section 17, Township 117, Range 23 <br />Hennepin County No. 1595 <br />Review and Rec endations <br />We reviewed the above site plan and make the following comments: <br />- For any future improvements to CSAH 15 the developer should dedicate an <br />additional 7 feet of right of way making the right of way 40 feet from the <br />center of CSAH 15. <br />- The location of the two access points is acceptable to Hennepin County. Any <br />revision to an existing county road access requires an approved Hennepin <br />County entrance permit before beginning any construction. Contact our <br />Maintenance Division for ent ance permit forms. <br />- All proposed construction within County right of way requires an approved <br />utility permit prior to beginning construction. This includes, but is not <br />limited to, drainage and utility construction, trail development, and <br />landscaping. Contact our Maintenance Division for utility permit forms. <br />- The developer must restore all areas disturbed during construction within <br />County right of way. <br />Please direct any response or questions to Les Weigelt. <br />Sin:erely, <br />David W. Schmidt, P.E. <br />Transportation Planning <br />DWS/LDW:lw <br />HENNE�=-IN COUNTY <br />an equal opportunity employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.