Laserfiche WebLink
CITY OF ORONO <br />1988 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS --EQUIPMENT IS BID PER HOUR? RATE <br />3/4 TON PICKUP <br />W/8 PLOW PER HOUR <br />---------------------------------------------------------------------------------------------------- <br />Schoening Excavating 34.00 <br />* <br />---------------------------------------------------------------------------------------------------- <br />MBE Inc. <br />38.00 <br />---------------------------------------------------------------------------------------------------- <br />(2) <br />Robert L. <br />Innes <br />35.00 <br />(1) <br />SKID STEER <br />WHEEL <br />LOADER <br />WHEEL LOADER <br />PER <br />HOUR <br />PER HOUR <br />2CY <br />RATE <br />MFG. RATE <br />---------------------------------------------------------------------------------------------------- <br />Schoening <br />Excavating <br />Cat 950 <br />48.00 <br />Case 1845 45.00 <br />(1) <br />(2) <br />---------------------------------------------------------------------------------------------------- <br />Volkenant <br />& Sons <br />Fiat Allis 60.00 <br />Melroe 700 38.00 <br />---------------------------------------------------------------------------------------------------- <br />(2) <br />(1) <br />MBE <br />Kom 450 <br />75.00 <br />---------------------------------------------------------------------------------------------------- <br />(3) <br />Robert L. <br />Innes <br />Cat 910 <br />40.00 <br />Bobcat 743 35.00 <br />* <br />* <br />* DENOTES LOW BID <br />1-3 ALTERNATES <br />'-0 <br />