My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
02-22-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/18/2025 10:02:19 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
2/22/1988
Retention Effective Date
8/18/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASSESSMENTS <br />The project costs as outlined are proposed to be assessed to the adjacent <br />property based on benefit received. The City Is presently working with Han - <br />tiepin County and the Pollution Control Aggncy to determine what outside fund- <br />ing may be available to assist in minimising the project cost share of each <br />homeowner. <br />There sr 25 u is which are to be served :n Part I, Stubbs Bay Northwest <br />and there are 38 units which are to be served in Part II Stubbs Bay Northeast. <br />E <br />Part I - Stubbs Bay Northwest <br />Total Estimated Project Cost $342,990 <br />Estimated Unit Cost $ 13,720 <br />Part I1 - Stubbs Bay Northeast <br />Total Estimated Project Cost $479,100 <br />Estimated Unit Coat $ 12,610 <br />The unit cost would be slightly less than the amount indicated for the <br />Stubbs Bey Northeast area if a permit could be acquired from the DNR to place <br />the force main along the Luce Line Trail. <br />The property owners will be required to pay a SAC fee of $475.00 plus the <br />cocrectlon from the host: to the sewer main. It is anticipated that the <br />private connection charge will be approximately $950.00 for the average lot. <br />The property proposed to be assessed for the sanitary sewer improvements <br />is as follows: <br />r-B"_0', <br />Lot <br />I through 10 Block 1 <br />Hillside Park <br />Addition <br />Lot <br />11 through 11 Block 2 <br />Hillside Park <br />Addition <br />Lot <br />14 through 19 Block 2 <br />Hillside Park <br />Addition <br />Lot <br />52. 57 and 59 through 64 <br />Auditors Subdivision <br />No. 203 <br />Lot <br />1 through 24 <br />Ottoville on <br />Lake Minnetonka <br />The above described pi •erty is <br />located in the North <br />1/2 Section 5 Town- <br />ship 117 <br />Range 23 west deanepin <br />County, Minnesota. <br />0-8620b <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.