Laserfiche WebLink
i <br />a <br />E1 <br />DISCUSSION <br />The sanitary sever system in the Stubbs Bay area has been separated into <br />Part I, Stubbs Bay Northwest, and Part II, Stubbs Bay northeast. The Stubbs <br />Bay Northwest area would be ser-md by construction of a lift station on West <br />aka Street and a force min to TonLwa Road and the existing system. The <br />lateral line would be extended north along West Lake Street to Bayside Road <br />and then east approximately 1,3DO feet to serve adjacent property. There are <br />25 homes in the Stubbs Bay Northwest area which would be served by the im- <br />prove,- at. <br />The Stubbs Bay Northeast area would be served by construction of a lift <br />station near the intersection of Bayside Road and Tonka Avenue. The force <br />�,in would -- constructed from the lift station to the easterly manhole in <br />Part T. The report provides for an alternate alignment for the force main <br />which would follow the Luce Line Trail. There are 38 homes in the Stubbs Bay <br />Northeast Area which would be served by the improvement. <br />The project will generally be constructed within the right-of-way of <br />existing streets, but the alignment selected will require some permanent ease- <br />ments and a number of temporary easements to allow construction. Permits from <br />Hennepin County, the DNB and MWCC will be required. <br />The streets disturbed during construction will be replaced with 8 inches <br />of Class 5, 100 percent crushed end 3 inches of 2341 bituminous surfacing. <br />The boulevards and easements will be sodded and the area disturbed along the <br />railroad and county right-of-way will be seeded. The removal of several trees <br />along the right-of-way and an required easements will be necessary to fecili- <br />tate construction of the sever line. <br />0-8620b <br />- 4 - <br />COST ESTIMAIL:q <br />Cost estirates have been prepared for the extension of sanitary sever to <br />the Stubbs Bay area. The summary of project costa are provided in this see- <br />tion with detailed cost estimates for the work described presented in the <br />appendices at the back of this report. The estimates for the work are Lased <br />on anticipate ..ait prices for the 1784 construction season. <br />The cost estimates presented below include a five percent allowance for <br />contingencies and a 25 percent allowance for project design administration, <br />bonding capitalized interest and legal costs. <br />Part I - Stubbs Bay Northwest i Q ° S <br />84-3 Sanitary Sever Extension $211,890 _,q�?5`/ <br />84-4 Street and Blvd. Restoration 131,100 �-3 i ba O <br />Total Project Cost - Part I $342, 990 -- 711 q 1` / <br />Part II - Stubbs Bay Northeast <br />84-5 Sanitary Sewer Extensf 4248,500 <br />84-6 Street and Blvd. Restoration 230,600 2 <br />Total Project Cost - Part 11 $479,100 E08,790 <br />Alternate I Force Maln Relocation DEDCCT $34,8CO EM+E <br />Each project will require a lift station to hump the sewage into the <br />existing Orono sewer system. The estimated annual operation and maintenance <br />cost for the lift station in Part I is $4.550 and the lift station in Part II <br />is $4,450. <br />- 5 - <br />0-8620b <br />