My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
02-08-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/15/2025 11:40:15 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
2/8/1988
Retention Effective Date
8/15/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD JANUARY 11, 1980 <br />1223 JOHN WAI.DRON <br />1951 CONCORDIA STREET <br />CONDITIONAL USE PERMIT/ <br />VARIANCE <br />Juhn and Lynn Waldron were present for this matter. <br />City Administrator Bernhardson explained the request to <br />repair the lakeshore bank that was damaged during the <br />1987 storm by lowering the grade to create a walkout <br />from the existing house, construct a retaining wall <br />along that cut up to the house, and regrade the slope <br />and seed it along the lakeshore. Planning Commission <br />recommended denial of the wal:cout cut, feeling it was <br />not related to the stabilization of the bank Prosion, <br />aiid finding that allowing the walkout cut would set a <br />fi.:ecedent in conflict with current City philosophy. He <br />cited two previous applications where a walkout and/or <br />grading were allowed within the 0-75' lakeshore setback <br />zor.q, however unique hardships were present in these <br />cases that are not present in the Waldron application. <br />Per staff memo, Planning Commission recommended <br />approval of the ground level deck as proposed sabject to <br />concurrent removal of the existing platform structure <br />near the lake. Staff generally agreed with Planning <br />Commission's recommendation. <br />Mr. Waldron submitted photos of his property and <br />explained that 2 to 4 feet of level ground at the top of <br />the slope was lgst during the storm, and he would like <br />to restore that area. Addressing the City's concern on <br />the effect of the quality and quantity of runoff into <br />the lake, he stated it has been established that his <br />proposal would not adversely effect the lake. <br />In response to Mr. Waldron's statement, City Engineer <br />Cook stated ti,Qre would be very little difference in the <br />actcia 1 quality of the runoff water with any of the <br />options used. <br />Mr. Waldron explained that grading would be required <br />with any option used. Aesthetically, he felt his <br />proposal is preferable to the other options. He stated <br />that his proposal would involve less earth disturbance. <br />As a safety issue, his proposal would provide a better <br />view of the lakeshore from the house. He noted that <br />based on estimates he has obtained, the amount of his <br />disaster loan would not afford the options of <br />stabilization fabric, cribbing, or retaining wall that <br />would stand up for years. Regarding setting a <br />precedent, he felt that the storm damaqe issue dsemed <br />his application unique. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.