My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 1/25/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 1/25/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:45 AM
Creation date
8/12/2025 1:25:00 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
1/25/1988
Retention Effective Date
8/12/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agreement No. PW 74-08-87 <br />County Project No. 8024 <br />County State Aid Highway No. 15 <br />City of Orono <br />County of Hennepin <br />CONSTRUCTION COOPERATIVE AGREEMENT <br />AGREEMENT, Made and entered into this day of <br />, 19 , by <br />and between the County of Hennepin, a body politic and corporate under the laws of the <br />State of Minnesota, hereinafter referred to as the "County" and the City of Orono, a <br />body politic and corporate under the laws of the State of ►' nnesota, hereinafter <br />referred to as the "City". <br />WITNESSETH: <br />WHEREAS, The County and the City have been negotiating to bring about the <br />improvement of that portion of County State Aid Highway No. 15 between County State <br />Aid Highway No. 110 and County State Aid Highway No. 19 (Engineer's Stations LGA 0+37 <br />to LGA 155+75) as shown on the County Engineer's plans for County Project No. 8024, <br />which improvement contemplates and includes grading, concrete curb and gutter, <br />drainage, watermain, bituminous surfacing, ..affic signal systems, conduit system, <br />lighting, Bridge No. 27560 and other related improvements; and <br />WHEREAS, The above described project lies within the corporate limits of the <br />City, and <br />WHEREAS, The County Engineer has heretofore prepared an engineer's estimate of <br />quantities and unit prices of material and labor for the above described project and <br />an estimate of the total cost for contract work in the sum of Four Million Five <br />Hundred Thirty Four Thousand Eight Hundred Twenty Seven Dollars and Thirty Five Cents <br />($4,534,827.35). A copy of said estimate (marked Exhibit "A") is attached hereto and <br />by this reference made a part hereif, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.