My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 8/11/2025
Orono
>
City Council
>
2025
>
Agenda Packet Cc - regular meeting 8/11/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:48 AM
Creation date
8/8/2025 2:06:07 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
8/11/2025
Retention Effective Date
8/8/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 7604 <br />NOW, THEREFORE, BE IT RESOLVED, based upon the findings of <br />Resolution No. 7542, the Orono City Council and the City of Orono do hereby approve the plat <br />of GREEN HAVEN FARM, Hennepin County, Minnesota (a copy of which is attached as Exhibit <br />A), subject to the following conditions: <br />1) Development within GREEN HAVEN FARM is subject to the Conclusions, Orders, and <br />Conditions enumerated within Preliminary Plat Resolution No. 7542 dated December 9, <br />2024. <br />2) Dedication on the plat of the perimeter Drainage and Utility Easements as required in <br />Resolution 7542. <br />3) Establishment of a Private Driveway Easement and Maintenance Agreement over the <br />shared driveway to serve both lots. <br />4) The approvals granted in this Resolution shall become effective only when all conditions of <br />approval requiring actions by the Developer have been satisfied. <br />5) Minnehaha Creek Watershed District (MCWD)-approved permits for the grading, stormwater <br />management facilities, stormwater pollution prevention plan (SWPPP), and erosion control <br />plan shall be submitted as needed. <br />6) A title opinion for the Property and certified copies of all recorded easements currently <br />affecting the Property have been submitted. <br />7) A demolition permit must be issued and final inspection completed for the shed to be <br />removed on Lot 1 before issuance of the new home and septic system permits for Lot 1. <br />8) The properties are not within the MUSA and will be served by private water supply wells and <br />septic systems. <br />9) Payment of Development Fees Required: Total: $14,420.81 <br />a. Final Plat application fee: $550.00 (2024 application fee). <br />b. Park Dedication Fee: $3,310.81. <br />c. Stormwater and Drainage Trunk Fee: $8,060.00 <br />d. Final Plat Escrow: $2,500.00 <br />10) The City Clerk shall release the plat documents for filing only upon certification by the City <br />Attorney, Community Development Director, and City Engineer that all requirements of the <br />platting regulations have been satisfied. <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.