Laserfiche WebLink
s <br />Preliminary :Jlat of Fox Bend - Septic System Testing <br />August 2?, 1989 <br />Page 2 of 4 <br />Lot 6, Block 1. The drainfield sites are near the rear <br />property line, and not likely to be affected by construction <br />t- _,ffic. These sites are located arjut 70' back from the <br />}.ravelled portion of Luce Line Trail, and should have no <br />affect nor be affected by the trail. Slopes are virtually <br />flat. Again, the likely house location would be in the <br />center of the lot. Depending on final house location, <br />additional sites might be located on this property. <br />Lot 1, Block 2. Primary and alternate drainfield sites have <br />bee.i located at the north end of the lot, adjacent to the <br />proposed road connection to Leaf Street. These sites both <br />require mound systems, and this is perhaps the most critical <br />lot of this subdivision since drainfield sites are uphill <br />from the proposed house location and surrounded on two sides <br />by proposed road construction. These sites must be <br />surrounded by snow fence to avoid any construction traffic:. <br />The building envelope is large enough that a house can be <br />constructed leaving approximately 50-60' or more setback <br />from the drainfield sites. I would further recommend that <br />no driveways or other grading- be constructed within 30' of <br />the toe of the mound sites Again, the contour lines shown <br />on the topographic survey -3t quite jive with elevations <br />found in the field. <br />Lot 2, Block 2. Primary and alternate drainfield sites are <br />located at the southeast corner of the property near Fox <br />Street. The house site would be located north of the pond <br />area. The two drainfield sites tested must be preserved, <br />since they are the only two available sites on the property, <br />both requiring mounds. From a technical standpoint, <br />location of drainfield systems as much as 300-350' away from <br />the house should not cause any problems. <br />Lot 3, Block 2. Both primary and alternate drainfield sites <br />were located on the property. The primary site would be <br />suitable for a trench -type system. The alternate site would <br />require a mount:. Both sites are located in the wooded area <br />of the lot. <br />Lot 4, Block 2. Both prima-- and alternate drainfield sites <br />have been located. Those sites are generally parallel <br />with the proposed road and near the north lot line. These <br />sites definitely need to be snow fenced totally in order to <br />preserve them during road construction. <br />