My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 10/23/1989
Orono
>
City Council
>
1989
>
Agenda Packet Cc - regular meeting 10/23/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:45 AM
Creation date
8/1/2025 1:40:34 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
10/23/1989
Retention Effective Date
8/1/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s <br />Preliminary Plat of Fox Bend - Septic System Testing <br />August 22, 1989 <br />Page 4 of 4 <br />General Comments - <br />Each proposed lot appears to have suitable primary and <br />alternate drainfield sites. On some lots, the primary and <br />alternate sites shown are the only possible sites available. On <br />other lots, it is likely that additional testing could find a <br />number of potential sites, allowing additional flexibility in <br />house placement. <br />In each case, drainfield sites have been designed to meet <br />the minimum 20' setback from property lines, and 75' setbacks <br />from designated wetlands. <br />On the majority of lots, extreme caution must be taken <br />during construction of improvements to the property. Road <br />construction will take place within 50' of test-d drainfield <br />sites on at least 6 of 17 lots, and on 2 lots the sites are <br />relatively near the area proposed to be graded to provide a <br />detention basin. I would recommend that each lot have drainfield <br />sites protected by snow fence totally surrounding the drainfield <br />sites at a distance 20' from the boundaries of each drainfield <br />system. Additionally• when road construction plans arA <br />submitted, I would like to revi aw them to determine where road <br />cut would have a potential impact on drainfield sites. <br />Summary - <br />Out of 34 drainfiel% sites test d, 29 require mound systems <br />and 5 would allow a tren -type system. Each lot has primary and <br />alternate sites design -d. It would not be surprising if as <br />many as 20% of the sites timately will have to be re -tested due <br />to the buyer's preference for house sites near or conflicting <br />with drainfields. Some lots are extremely limited for potential <br />drainfield sites, others provide a degree of flexibility in house <br />placement. <br />Given the above facts, concerns, and cons`raints, I would <br />recommend approval of the subdivision as proposed. Accompanying <br />this memo is a topographic survey of the preliminary plat showing <br />potential house locations ind locat:1_ons of both primary and <br />alternate drainfield sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.