Laserfiche WebLink
PROJECT:S. Sewer Impr. Lift St. No. 10 and No. 43 Replacement <br />PLACE: Orono, Minnesota <br />CONTRACTOR: Albrecht Excavating, Inc. <br />STATEMENT OF WORK <br />Contract Item Unit <br />PART II - LIFT STATION NO. 43 REPLACEMENT <br />10" PVC, 10'-12' deep in place <br />L.F. <br />10" PVC, 14'-16' deep in place <br />L.F. <br />10" PVC, 16'-18' deep in place <br />L.F. <br />Std. manhole 8' deep, 4' dia., <br />v/1642B cstg. <br />Each <br />Manhole depth greater than 8' deep <br />L.F. <br />Erosion control fence <br />L.F. <br />Remove existing manhole <br />Each <br />Drop manhole section <br />L.F. <br />10" x 4" PVC service wye branch <br />Each <br />10" x 6" PVC service wye branch <br />Each <br />Cut into existing manhole <br />Each <br />Connect existing service line <br />Each <br />4" CISP service pipe in place <br />L.F. <br />6" CISP service pipe in place <br />L.F. <br />Improved pipe foundation per 6" <br />increment depth <br />L.F. <br />Mechanical trench compaction <br />L.F. <br />Remove Lift Station 43 <br />L.S. <br />Common excavation <br />C.Y. <br />Class 5 aggregate base (100Z crushed) <br />Ton <br />Erosion control fence <br />L.F. <br />PR13940 <br />Unit <br />Price <br />$20.00 <br />20.00 <br />23.00 <br />800.00 <br />50.00 <br />1.50 <br />200.00 <br />175.00 <br />68.00 <br />79.00 <br />650.00 <br />160.00 <br />9.00 <br />13.00 <br />PAYMENT NO: 3 <br />FILE NO: 13940 <br />DATE: October 4, 1989 <br />Est'd Quantity Amount <br />Quantity To Date To Date <br />800 <br />75 <br />50 <br />3 <br />15 <br />250 <br />6 <br />3.8 <br />15 <br />1 <br />1 <br />15 <br />150 <br />10 <br />1.50 1,300 <br />0.01 <br />1,075 <br />6,000.00 <br />L S <br />3.00 <br />500 <br />8.67 <br />950 <br />1.50 <br />250 <br />Page 3 <br />