My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
10-23-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
8/1/2025 1:40:34 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
10/23/1989
Retention Effective Date
8/1/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECf:S. Sewer Impr. Liit St. No. 10 and No. 43 Replacement <br />PLACE: Orono, Minnesota <br />CONTRACTOR: Albrecht Excavating, Inc. <br />W <br />STATEMENT OF WORK <br />Contract Item Unit <br />PART I - LIFT STATION NO. 10 REPLACEMENT CONT'D <br />Connect existing service line <br />Each <br />4" CISP service pipe in place <br />L.F. <br />4" CISP service riser pipe in place <br />L.F. <br />Improved pipe foundation per 6" <br />increment depth <br />L.F. <br />Mechanical trench compaction <br />L.F. <br />Remove Lift Station 10 <br />L.S. <br />Common excavation <br />C.Y. <br />Bituminous surfacing removal <br />S.Y. <br />5 aggregate bare (10OZ crushed) <br />Ton <br />'--..loss 5 aggregate base shoulders <br />(100Z crushed) <br />;,)n <br />2341 bituminous wearing surface <br />Ton <br />2341 bituminous binder surface <br />Ton <br />AC-1 bituminous material for mixture <br />Ton <br />Bituminous material for tack coat <br />Gals <br />2341 bitum. st. & driveway patching <br />Ton <br />Erosion control fence <br />L.F. <br />Clear and grub trees <br />Each <br />Sod with 3" topsoil <br />S.Y. <br />Seeding w/3" topsoil, mulch <br />and fertilizer <br />Ac. <br />PAYMENT NO: 3 <br />FILE NO: 13940 <br />DATE:October 4. 1989 <br />Unit Est'd Quantity Amount <br />Price Quantity To Date To Date <br />$160.00 <br />20 <br />19 <br />$3,040.00 <br />9.00 <br />250 <br />44 <br />396.00 <br />11.00 <br />60 <br />223 <br />2,453.00 <br />1.50 <br />0.01 <br />6,000.00 <br />1.00 <br />1.00 <br />8.67 <br />8.67 <br />15.30 <br />13.77 <br />127.50 <br />1.02 <br />30.60 <br />1.50 <br />250.00 <br />1.80 <br />550.00 <br />3,200 <br />1,600 <br />L S <br />1,900 <br />3,000 <br />2,400 <br />250 <br />275 <br />470 <br />45 <br />300 <br />50 <br />100 <br />5 <br />2,500 <br />0.3 <br />2,613.5 3,920.25 <br />1,590 15.90 <br />1,084 1,084.00 <br />3,000 3,000.00 <br />2,060.97 17,868.61 <br />651 <br />8,964.27 <br />35.8 <br />4.564.50 <br />100 <br />102.00 <br />/"AL PART I - LIFT STATION NO. 10 REPLACEMENT $102,416.53 <br />TR13940 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.