My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
09-25-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
7/29/2025 11:54:14 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
9/25/1989
Retention Effective Date
7/29/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,. 73 <br />' iiuJ •,R •r��, � <br />City of oro�w: 1 <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 1386 <br />NOW, THEREFORE, BE IT RESOLVED that the City Council of the <br />City of Orono hetei,y dpPrcvcc the setback variance of David J. Delanev <br />to permit the construction of a canopystructure iii con ••^^}i^n with the <br />; �.__.... . <br />installation of dual remote lanes for the First National Pink of Navarre <br />based on one or more of the following findings of fact: <br />1) The property is located within both the B-3 &Aid B-•1 <br />commercial zoning districts. The total area of the <br />property is approximately 25,000 sf; the predominant <br />zoning district, B-4, requires 20,000 sf of area. <br />The property is 100' wide; the B-4 zoning district <br />requires 100' of width. <br />2) The bank has operated from this site since 1964. <br />3) The applicant proposes installing a second remote <br />lane adjacent to the existing one on the south :ide <br />of the existing structure. In conjunction with the <br />installation of the second remote lane, a canopy <br />structure will be erected that will extend 15.5' <br />from the bank structure and 3.5' from th side lot <br />line. <br />4) The proposed canopy structure will req-i i a side <br />setback variance as follows: <br />B-4 Commercial Zoning District <br />requires 15' side setback <br />existing 16.9' - at rear SW corer of bank <br />proposed 3.5 <br />variance '.1.5 or 76% <br />5) The installation of the second remote lane will also <br />necessitate relocating sections of the existing retaining <br />wall and rebuilding one along the south property line. <br />6) Ur. Paul Englund, property owner to the south, has <br />submitted a letter dated April 2, 1982, giving his <br />consent to the construction of such a retaining wall, <br />..:_Uns of which may extend over the shared lot line. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.