My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-28-2025 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
2025
>
07-28-2025 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
7/28/2025 11:11:54 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
7/28/2025
Retention Effective Date
7/28/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />M <br />r <br />UTILITIES <br />property owners, demonstrating an actual <br />hydrologic response substantially different from <br />the REF being used for the parcel. Such adjust- <br />ment shall be made only after receiving the <br />recommendation of the city engineer and shall <br />not be made effective retroactively. <br />(Code 2003, § 14-257; Ord. No. 213(2nd series), <br />§ 1(6), 12-10-2001) <br />Subdivision IV. Stormwater Trunk Fee <br />Sec. 2.04.1210. Statutory authority. <br />Minn. Stats. § 444.075 authorizes cities to <br />impose just and reasonable charges for the use <br />and availability of storm sewer facilities (charges). <br />By this subdivision, the city elects to exercise <br />such authority. <br />(Code 2003, § 14-281; Ord. No. 214(2nd series), <br />§ 1(1), 12-10-2001; Ord. No. 149(3rd series), § 1, <br />5-26-2015) <br />Sec. 2.04.1220. Findings and determina- <br />tions. <br />In providing for such charges, the findings <br />and determinations set out in this section are <br />made. <br />(1) In the exercise of its governmental author- <br />ity and in order to promote the public <br />health, safety, convenience and general <br />welfare, the city has constructed, oper- <br />ated and maintained a storm sewer system <br />(the system). This subdivision is adopted <br />in the further exercise of such authority <br />and for the same purpose. <br />(2) The system, as constructed, heretofore <br />has been financed and paid for through <br />the imposition of special assessments <br />and ad valorem taxes. Such financing <br />methods were appropriate to the <br />circumstances at the time they were <br />used. It is now necessary and desirable <br />to provide an alternative method of <br />recovering some or all of the future costs <br />of improving, maintaining and operating <br />the system through the imposition of <br />charges as provided in this subdivision. <br />§ 2.04.1230 <br />(3) Development of land changes the <br />characteristics of the stormwater runoff <br />from the property and results in the need <br />for improved stormwater facilities, and <br />also increases the demand on the storm - <br />water system, which results in greater <br />maintenance and operational costs of the <br />system. <br />(4) In imposing charges, it is necessary to <br />establish a methodology that undertakes <br />to make them just and equitable. Taking <br />into account the status of completion of <br />the system, past methods of recovering <br />system costs, the topography of the city <br />and other relevant factors, it is determined <br />that it would be just and equitable to <br />assign responsibility for some or all of <br />the future costs of operating, maintain- <br />ing and improving the system on the <br />basis of the acreage of land to be <br />developed. <br />(5) Assigning costs and making charges based <br />upon expected typical stormwater runoff <br />cannot be done with mathematical preci- <br />sion but can only be accomplished within <br />reasonable and practical limits. The provi- <br />sions of this subdivision undertake to <br />establish a reasonable and practicable <br />methodology for making such charges. <br />(Code 2003, § 14-282; Ord. No. 214(2nd series), <br />§ 1(2), 12-10-2001; Ord. No. 149(3rd series), § 1, <br />5-26-2015) <br />Sec. 2.04.1230. Rates and charges. <br />(a) Establishing. The stormwater trunk fee <br />charges, for various land uses, shall be included <br />in the city fee schedule and shall be changed as <br />necessary by resolution of the council. <br />(b) Determination. The city has developed a <br />surface water management plan that includes <br />design criteria for stormwater systems and <br />preliminary design information for a <br />comprehensive stormwater system in the city. In <br />general, stormwater trunk fees are calculated by <br />dividing the total cost of system construction, by <br />the number of developable acres the system will <br />CD2:21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.